Sagkeeng (Fort Alexander) Assisted Living Complex
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Sagkeeng First Nation is looking to construct an accessible, ten-unit supported living complex for persons with disabilities living in the community. The proposed Sagkeeng assisted living housing project will include both a residential and commercial component for a total area of 11,320 sq ft.
The residential portion of the building will include ten one-bedroom suites, each approximately 600 sq feet in size. The suites will be fully accessible and conforming to universal design principles. Each suite will be designed for independent living and include a full kitchen. The building will have a common entrance for the residential units and approximately 850 sq ft of common space for recreation and programming purposes. An additional 1,200 sq ft has been allocated for circulation and service rooms.
The commercial component of the building will consist of approximately 3,270 sq ft of office space which will be rented by the Home Care Program run by Sagkeeng Health Centre. The commercial space will have a separate entrance from the residential component of the building. The Home Care Program requires three private offices, a procedure room, storage room, reception area, and two larger spaces for charting meetings. In addition, the Home Care Program requires a tub room for bathing clients, and bathrooms for use by clients and staff.
The living complex is being proposed to be built on Lot 121 of Sagkeeng First Nation, an area which is currently an unused green field. There is currently no existing infrastructure located on the proposed site. The Health Center is located across the road from the proposed site.
Activities may include but are not limited to mobilization and demobilization, clearing of vegetation and grubbing, excavation and backfill, piling forming and pouring concrete, utility trenching and connections, erecting structural components, proper onsite and offsite waste management, mechanical - plumbing and HVAC, electrical, millwork, carpentry, landscaping, etc. Upon commissioning, activities at the site will include residential operation and maintenance which may include, but not be limited to vegetation maintenance, cleaning, upkeep of grounds, parking lot usage, and minor residential chemical storage.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Sagkeeng (Fort Alexander) Assisted Living Complex | - | March 29, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | February 26, 2021 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
-
Location
- Sagkeeng First Nation (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-02-27 -
Proponent
Sagkeeng First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81413
Nearby assessments
...within 200 kilometres-
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
New Fibre Installation
Hollow Water First Nation no.10 -
Cancelled
Hollow Water -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Vivian Sand Processing Facility Project and Vivian Sand Extraction Project
Springfield -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Energy East Project
Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein Band
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Women's Lodge & Cultural Safe Space
Kejick -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Northwest Angle 33 FIrst Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Berens River Bridge Replacement
Berens River First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Enbridge Line 3 Replacement Program
Gretna -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation