In support of the new Impact Assessment Act, the Impact Assessment Agency of Canada has redesigned and implemented a new Canadian Impact Assessment Registry. Learn more about the new Registry.

Registry Search Mobile

Registry Search

Upgrade of the Windigo Island Docking Infrastructure Accessibility

The Project focuses on the design and construction of a steel pipe dock. The project scope includes the drilling of steel pipes into the bedrock, a steel I beam frame with cross bracing installed on top, skirting, a top travel surface, ramps and floating docks. The Project aims to address public health and safety concerns; reduce the probability of asset failure and service interruptions; achieve service levels and key performance indicators established by the asset management plan; and reduce lifecycle costs.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

A public participation period is underway.

List all documents

Contacts


Date modified: