Upgrade of the Windigo Island Docking Infrastructure Accessibility
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Project focuses on the design and construction of a steel pipe dock. The project scope includes the drilling of steel pipes into the bedrock, a steel I beam frame with cross bracing installed on top, skirting, a top travel surface, ramps and floating docks. The Project aims to address public health and safety concerns; reduce the probability of asset failure and service interruptions; achieve service levels and key performance indicators established by the asset management plan; and reduce lifecycle costs.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
2022-10-07– Infrastructure Canada has issued the Notice of Determination and determined that the project was not likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination: Upgrade of the Windigo Island Docking Infrastructure Accessibility | - | October 7, 2022 |
Contacts
Aboriginal Consultation and Environmental Services1100 - 180 Kent St
Ottawa, Ontario K1P 0B6
Email: infc.aboriginalconsultenv-consultautochtonesenv.infc@canada.ca
-
Location
- Windigo Islands (Ontario)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2019-11-15 -
Proponent
Animakee Wa Zhing #37 -
Authorities
- Infrastructure Canada
-
Assessment Type
Project on federal lands -
Reference Number
80314
Nearby assessments
...within 200 kilometres-
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Northwest Angle 33 FIrst Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Women's Lodge & Cultural Safe Space
Kejick -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Big Grassy First Nation Cultural Space Building
Morson -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Wastewater Plant Replacement
Naotkamegwanning First Nation Reserve -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Rainy River Gold Project
Township of Chapple -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Caribou Street Culvert Replacement
Rainy River First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Vivian Sand Processing Facility Project and Vivian Sand Extraction Project
Springfield -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Goliath Gold Project
Dryden -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Energy East Project
Winnipeg -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Josephine Cone Mine Project
Ignace -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Seine River First Nation Standpipe Replacement
Seine River First Nation -
Abandoned Fuel Tank Decommissioning
Seine River First Nation -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Bending Lake Iron Project
49 kilometres southwest of Ignace -
Enbridge Line 3 Replacement Program
Gretna