New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
New Fibre Installation
BCN plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Little Black River and Hollow Water communities. The project involves the installation of approximately 23 km of underground fiber optic cable from the 1) Manitoba Hydro Telecom vault on PR-304 to the Intersection of PR-304 and O"Hanly Rd, and from that intersection, along O'Hanly Rd towards Little Black River; and 2) from Manitoba Hydro Telecom network on PR-304 (between Rice River Rd to the East and the Main St. in the west) to the intersection of PR-304 and Main St., and from that intersection, along Main St. to Hollow Water.
The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Determination - New Fibre Installation (Broadband Communications North Inc. (BCN)) | - | July 5, 2022 |
Contacts
Innovation Science Economic DevelopmentNathalie Martel, Program Officer
Telephone: 343-575-4534
Email: get-connected-branchez-vous@ised-gc.ca
-
Location
- Black River First Nation no. 9 (Manitoba)
- Hollow Water First Nation no.10 (Manitoba)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2022-05-31 -
Proponent
Broadband Communications North Inc. (BCN) -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
83679
Nearby assessments
...within 200 kilometres-
Cancelled
Hollow Water -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein Band
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Vivian Sand Processing Facility Project and Vivian Sand Extraction Project
Springfield -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Energy East Project
Winnipeg -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Women's Lodge & Cultural Safe Space
Kejick -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Northwest Angle 33 FIrst Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands