Little Grand Rapids First Nation School
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Project Summary:
Indigenous Services Canada (ISC), in partnership with the Little Grand Rapids First Nation (LGRFN), are proposing to construct a new K-12 school and associated sporting/recreational facilities within theLGRFN communityon Indian Reserve (IR. 14) land (the project). Once completed, the school will beowned and operated by theLGRFN.The Project is generally located on the southside of the LGRFN community and approximately60m from adjacent residences and175 m from the main community road (see Attachment A).Coordinates of the project location are: 331441.84E, 5765560.00N (UTM Zone15U)
The Project will require clearing an area of approximately 5 hectares of forest within Indian Reservation land (IR. 16) adjacent to the existing community of LGRFN.The school will consist of a reinforced concrete foundation with piles to bedrock, a steel framed superstructure with concrete block and steelstud infill walls, finished with masonry and metal cladding and a modified bitumen roof.
NDL Constructionwas awarded the design-build contract to complete the architecture and engineeringdesign of the school and to lead its construction planning and delivery.Number Ten Architecture Groupis responsible forthe design component of this project and,Dillon Consulting Ltd. is providingenvironmental and civil engineering services in support of Number Ten Architecture Group
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Determination for the Little Grand Rapids First Nation School | - | June 2, 2020 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
-
Location
- Little Grand Rapids First Nation School (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2019-12-06 -
Proponent
Little Grand Rapids First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80358
Nearby assessments
...within 200 kilometres-
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein Band
Bloodvein School -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Cancelled
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Poplar River First Nation
Poplar River First Nation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 — All-Season Road Connecting Berens River to Poplar River First Nation
-
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Poplar River First Nation - Community Wharf - 2022/2023
Poplar River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
New Fibre Installation
North Spirit Lake -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake Cultural Area
Sandy Lake -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Lake Manitoba and Lake St. Martin Outlet Channels Project