Little Grand Rapids Submarine Cable Installation Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Installation of new distribution infrastructure in and adjacent to Family Lake including 4 submarine cables (5 cm diameter x 1200 m) running from the proposed dip pole on the west shore to the proposed riser pole on the east shore of Family Lake.
Latest update
November 20, 2020– Indigenous Services Canada issued its notice of determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Little Grand Rapids Submarine Cable Installation | - | November 20, 2020 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
-
Location
- Little Grand Rapids (Manitoba)
-
Nature of Activity
- Hydroelectric Energy
-
Assessment Status
Completed -
Start Date
2020-11-23 -
Proponent
Little Grand Rapids First NAtion -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81168
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Hollow Water Wharf Construction
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Wharf Replacement, Hecla, Manitoba
Hecla, Manitoba -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Black River First Nation - Transitional Housing
Black River First Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Teacherages Project (Site Servicing)
Poplar River First Nation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation
North Spirit Lake First Nation -
New Fibre Installation
North Spirit Lake -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba