Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Gull Harbour, Manitoba is located on Hecla Island approximately 200km North of Winnipeg, MB at the end of Provincial Highway 8. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH).
Small Craft Harbours Branch, (SCH) is proposing to reconstruct the launch ramp at Gull Harbour, Manitoba. The scope of work includes the demolition and removal of the existing launch ramp and the construction of a new launch. The work area at Gull Harbour is approximately 275m2. The work will be done in open water conditions using shore-based equipment and is scheduled for Fall 2021.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
July 27, 2021 – Fisheries and Oceans Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Contacts
Fisheries and Oceans Canada, Small Craft Harbours BranchStephen Mazur, Senior Project Technologist
501 University Crescent
Winnipeg, Manitoba R3T 2N6
Telephone: 204-984-5610
Email: stephen.mazur@dfo-mpo.gc.ca
-
Location
- Gull Harbour (Manitoba)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2021-06-23 -
Proponent
Fisheries and Oceans Canada, Small Craft Harbours Branch -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
81727
Nearby assessments
...within 200 kilometres-
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Cancelled
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein Band
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Vivian Sand Processing Facility Project and Vivian Sand Extraction Project
Springfield -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Energy East Project
Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Poplar River First Nation
Poplar River First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation