Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Project involves the design and construction of a CFS Prevention Centre building (5,800 m2) and staff housing (1,700 m2) in Pauingassi First Nation. The Prevention Centre will include a garage, storage space, parking, road access, and outdoor learning and play areas. The Staff Housing building will be a multi-dwelling building and will incude a garage. The proposed project will be located in the northeast section of the community. It will be situated southeast of the community school on undeveloped land. Project activities will include clearing of .75 ha of forested land, excavation of bedrock, building construction, connection to utilities, landscaping and management of consruction waste materials.
Latest update
May 31, 2025 – The public comment period on the project is closed. The Indigenous Services Canada is/are considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period - Indigenous Services Canada | - | May 2, 2025 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Pauingassi First Nation (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2025-05-02 -
Proponent
Pauingassi First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89508
Nearby assessments
...within 200 kilometres-
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum First Nation - 10 Unit Residential Construction Project
Pikangikum First Nation -
Construction of 10 Houses within Deer Lake First Nation
Deer Lake First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
Hollow Water Wharf Construction
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Poplar River Bridge Replacement
Poplar River First Nation -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Black River Waste Transfer Station
Black River Reserve -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Black River First Nation - Transitional Housing
Black River First Nation -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation
North Spirit Lake First Nation -
Construction of 20 Housing Lots on North Spirit Lake First Nation
North Spirit Lake First Nation -
New Fibre Installation
North Spirit Lake -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Sandy Lake First Nation - Accommodations Building
Sandy Lake First Nation -
Sandy Lake First Nation - Health Services Building
Sandy Lake First Nation -
Sandy Lake First Nation Remediation Project
Sandy Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
St. Theresa Point First Nation - Old Bulk Fuels Decommissioning
St. Theresa Point First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 14: Island Lake region - Theresa Point Band Office -
St Theresa Point Northern Store Contamination Remediation
St Theresa Point Former Bulk Fuel Plant -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
St Theresa Point First Nation road re-construction
St Theresa Pt First Nation -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 2, MB -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 1, MB -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 3, MB -
New Nursing Station
Wasagamack First Nation -
Wasagamack - Fuel Tank Relocation - 2324
Wasagamack Fuel Tanks -
Aboveground Fuel Storage Replacement in Island Lake, Manitoba
Island Lake -
Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
Wasagamack First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 22: Island Lake region - Garden Hill Band Office -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 06: Island Lake region - Wasagamack Band Office -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Garden Hill First Nation Road Upgrades
Garden Hill -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP