Project Summary: The project will involve the installation of a multiphase extraction (MPE) system connected to approximately fifty-eight (58) extraction wells installed across the impacted area to a maximum depth of 13.0 mBGL. The wells will be complimented with independent compressed air lines and steel access covers. Soil vapour from the wells will be extracted under vacuum. Any impacted water entering the system will be treated through the water treatment unit (WTU) which will be equipped with pre-filter media, coalescing hydrocarbon separators, carbon/clay adhesion media and carbon polish. Confirmatory sampling of the treated water will be undertaken prior to discharge. All laboratory results will be compared to current FIGQG guidelines and updates for residential land use. Both the MPE and the WTU will be contained in a modified shipping container.
Infrastructure: Infrastructure will include: Modified shipping container for storage of the MPE and the WTU; Extraction wells; Fencing; and Electrical service.
Activities: Site preparation will include installing hydropoles for the MPE system, along with perimeter fencing. Construction activities will include installation of MPE system and extraction wells within parking lot area adjacent Northern Store/Commercial building. A boardwalk will be constructed along a portion of the site to allow pedestrian access from new parking area to building entryway. Operation will include monitoring the system to ensure it's fully operational on a continual basis and collecting treated water samples for confirmatory analysis prior to discharge. Site decommissioning will include decommissioning the extraction wells with a bentonite seal and removal of fencing and MPE system.
Waste generation: Any impacted water will be treated onsite (WTU) prior to discharge. General waste debris will be taken to the community landfill facility.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
3 | St Theresa Pt Northern Store Contamination Remediation | - | August 27, 2020 |
2 | St Theresa Pt Northern Store Contamination Remediation | - | August 27, 2020 |
Contacts
Indigenous Services CanadaLori Bueckert, Environmental Analyst
365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-227-3254
Email: lori.bueckert@canada.ca
Indigenous Services Canada
Shelly Johnson, Environmental Specialist
365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0709
Email: shelly.johnson@canada.ca
-
Location
- St Theresa Point Former Bulk Fuel Plant (Manitoba)
-
Nature of Activity
- Remediation and conservation
- Soil management
-
Assessment Status
Completed -
Start Date
2019-11-14 -
Proponent
St Theresa Point First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80311
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
St Theresa Point First Nation road re-construction
St Theresa Pt First Nation -
St. Theresa Point First Nation - Old Bulk Fuels Decommissioning
St. Theresa Point First Nation -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Wasagamack - Fuel Tank Relocation - 2324
Wasagamack Fuel Tanks -
Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
Wasagamack First Nation -
Aboveground Fuel Storage Replacement in Island Lake, Manitoba
Island Lake -
Garden Hill First Nation Road Upgrades
Garden Hill -
God's Lake First Nation Lumber Compound Site Fencing
God's Lake First Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
God's Lake First Nation Water Treatment Plant (WTP) Upgrades
God's Lake First Nation -
God's Lake Soil Remediation Project
God's Lake First Nation -
God's Lake Soil Remediation Project
God's Lake First Nation -
God's Lake First Nation Water Treatment Plant (WTP) Upgrades
God's Lake First Nation -
Aboveground Fuel Storage Replacement in God's Lake Narrows, Manitoba
God's Lake Narrows -
Red Sucker Lake First Nation New Aerated Lagoon
Red Sucker Lake First Nation -
Red Sucker Lake First Nation New Landfill
Red Sucker Lake -
Red Sucker Lake New School and Servicing
Red Sucker Lake First Nation New School and Services -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Manto Sipi Remediation of Former Band Tank Farm Site
Manto Sipi Cree Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Bunibonibee Cree Nation - 48 Unit Subdivision
Bunibonibee Cree Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
East of Lake Winnipeg -
Manto Sipi Cree Nation Prevention Building and Garage
Manto Sipi Cree Nation -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP -
Keewaywin First Nation New Landfill Access Road Construction
Kee-Way-Win First Nation -
Sachigo Lake First Nation - Lot Servicing for future houses
Sachigo Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kingfisher Lake PoP -
Sachigo Lake First Nation Wastewater Treatment Project
Sachigo Lake First Nation -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation
North Spirit Lake First Nation -
New Fibre Installation
North Spirit Lake -
Norway House Cree Nation Business Center
Norway House Cree Nation -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP