Regina Bay Water Treatment Project

The Animakee Wa Zing First Nation community of Regina Bay requires a new water treatment plant (WTP) and storage reservoir to replace the exsiting water treatment system currently in the community.The project will include installing a new water intake into the Lake of the Woods approximately 170 m off of the shore, a new reject water outfall pipe approximately 120 m into the lake, constructing a new WTP with a below ground reservoir, and installing water service piping throughout the community. The water treatment system will be sized for fire flows to design year 20, based on projected population growth. A plan of the water treatment and distribution system is attached.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

March 02, 2020 - Indigenous Services Canada issued its notice of determination ( https://iaac-aeic.gc.ca/050/evaluations/document/modification/134056 ) is not likely to cause significant adverse environmental effects.

Key documents

Key documents
Document Number Document Title File Date
2 Regina Bay Water Treatment Project (French Only) - March 2, 2020
1 Public Comment Period on Intent to Make a Determination PDF (418 KB) September 26, 2019

List all records

Contacts

  • Aaron Pervais
  • Indigenous Services Canada
  • 100 Anemki Place, Suite 101
  • Fort William First Nation, ON, P7J 1A5
  • Telephone: 807-624-5921
  • Email: aaron.pervais2@canada.ca