27 November 2020 – Indigenous Services Canada must determine whether the proposed project located in St Theresa Pt First Nation  is likely to cause significant adverse environmental effects.  To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.

 

Written comments must be submitted by 28 December 2020.

 

Shelly.Johnson@canada.ca

Sr Environmental Specialist

356 Hargrave Street, Winnipeg, MB

R3B 3A3

 

 

Multi-phase project to re-construct 40 kms of community roads.  First Phase is to reconstruct 10 km of main (primary) road from north cemetery to the landfill site south.  The construction will involve re-grading the road resurface the side ditch walls repair drainages.  Then apply a road stabilization solution to the entire road, a new layer of traffic gravel will be top-off, stabilization will include a long-term solution to our dust issues by applying an environmentally friendly non-corrosive dust stabilizer.

 

The existing main road will be scarified and 8 inches of new base will be added with the EarthZyme and dust-stop.  The road will be constructed to 9.5m width for 10 kms.  The construction will start in the middle of May and be completed by early September.