Notice of Determination

Saguenay – May 18 2021 – Saguenay Port Authority has determined that the proposed Paving of the salt storage area - Phase 2 is not likely to cause significant adverse environmental effects

This determination was based on a consideration of the following factors:

  • technically and economically feasible mitigation measures

Saguenay Port Authority is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, Saguenay Port Authority may carry out the project, exercise any power, perform any duty or function to enable the project to be carried out.

Document Reference Number: 3

Date modified: