2021-07-30 - Infrastructure Canada has determined that the proposed Replacement of Drinking Water Pipes in the Block subdivision in the Village at Garden River First Nation (the Project) is not likely to cause significant adverse environmental effects. 

This determination was based on a consideration of the following factors:

  • Impact on rights of Indigenous peoples;
  • relevant potential environmental effects;
  • comments revieved from the public; and
  • technically and economically feasible mitigation measures.

Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment.  Based on the consideration of these measures, Infrastructure Canada is satisfied that the carrying out of the Project is not likely to cause significant adverse environmental effects.

Document Reference Number: 2

Date modified: