Milton Logistics Hub Project
2022 Annual Reports and Follow-up Program Results
- 2022 Annual Report (PDF – 90.1 MB)
- 2022 Construction Ambient Air Quality Monitoring Follow-Up Program Results (PDF – 8.4 MB)
- Country Foods Follow-Up Program 2022 Report (PDF – 8.7 MB)
- 2022 Follow-Up Monitoring Program Results: Bobolink and Eastern Meadowlark Offsite Replacement Habitat (PDF – 10.7 MB)
- Fish and Fish Habitat Follow-Up Program Construction Monitoring Report 2022 (PDF – 5.7 MB)
- 2022 Construction Groundwater Monitoring Follow-Up Program Results (PDF – 97.3 MB)
- 2022 Follow-Up Monitoring Program Results: Migratory Birds (PDF – 322 KB)
- 2022 Follow-Up Monitoring Program Results: Monarch Replacement Habitat (PDF – 17.8 MB)
- 2022 Follow-Up Monitoring Program Results: Eastern Milksnake (PDF – 342 KB)
- Annual Results for the Surface Water Quality and Quantity Follow-Up Program - Construction 2022 (PDF – 63.2 MB)
- 2022 Follow-Up Monitoring Program Results: Snapping and Midland Painted Turtle (PDF – 70 KB)
- 2022 Construction Acoustic Environment Follow-up Program Results (PDF – 90 MB)
Document reference number: 1136