Site C Clean Energy Project

Registry Search Mobile

Registry Search

Skip to Filters

4509 results

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2871
  • Updated: 2024-07-18
  • Document: 158126E.html
  • Relevance: 400
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 349
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Document Analysis of BD Hydro's proposed New Borrow Source for Construction of Reservoir Cleaning Access Roads (Halfway River East Borrow Source)

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2867
  • Updated: 2022-12-08
  • Document: 145723E.pdf
  • Relevance: 340.91
  • Impact Assessment Agency of Canada ANALYSIS OF BC HYDRO ’S PROPOSED NEW BORROW SOURCE FOR CONSTRUCTION OF RESERVOIR CLEARING ACCESS ROADS (HALFWAY RIVER EAST BORROW SOURCE) DECEMBER 2022 2 Table of Contents Impact Assessment Agency of Canada ................................................................................. 1 Table of Contents ...
1 alternate format found
French PDF
  • Relevance: 289.91
  • Agence d’évaluation d’impact du Canada ANALYSE DE LA NOUVELLE SOURCE D’EMPRUNT PROPOSÉE PAR BC HYDRO POUR LA CONSTRUCTION DES ROUTES D’ACCÈS AU DÉBLAIEMENT DU RÉSERVOIR (SOURCE D’EMPRUNT À L’EST DE LA RIVIÈRE HALFWAY) DÉCEMBRE 2022 2 Table des matières Agence d’évaluation d’impact du Canada .............................................................................. 1 1. Introduction ...

Document Amendment Analysis Report (see Reference #2865)

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2866
  • Updated: 2022-10-14
  • Document: 145281E.pdf
  • Relevance: 335.92
  • Impact Assessment Agency of Canada ANALYSIS OF BC HYDRO ’S PROPOSED CHANGES TO THE HIGHWAY 29 CROSSING DESIGNS AT FARRELL CREEK, DRY CREEK AND LYNX CREEK FOR THE SITE C CLEAN ENERGY PROJECT OCTOBER 2022 2 Table of Contents Impact Assessment Agency of Canada ................................................................................. 1 Table of Contents ...
1 alternate format found
French PDF
  • Relevance: 284.92
  • Agence d’évaluation d’impact du Canada ANALYSE DES CHANGEMENTS PROPOSÉS PAR BC HYDRO AUX CONCEPTIONS DES TRAVERSES DE LA ROUTE 29 AUX RUISSEAUX FARRELL, DRY ET LYNX POUR LE PROJET D ’ÉNERGIE PROPRE DU SITE C OCTOBRE 2022 2 Table des matières Agence d’évaluation d’impact du Canada .............................................................................. 1 Table des matières ...

Document Analysis of BC Hydro's Proposed Changes to the use of West Pine Quarry for the Site C Clean Energy Project (see reference document #2831)

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2832
  • Updated: 2018-11-21
  • Document: 126051E.pdf
  • Relevance: 238.23
  • Analysis of BC Hydro’s Proposed Changes to the use of West Pine Quarry for the Site C Clean Energy Project November 2018 2 | P a g e Table of Contents 1 Introduction ................................................................................................................................. 3 2 Proposed Project Design Changes ............................................................................................. 4 2.1 Agency’s Analysis of Changes ...
1 alternate format found
English HTML
  • Relevance: 238.23
  • Analysis of BC Hydro's Proposed Changes to the use of West Pine Quarry for the Site C Clean Energy Project November 2018 Table of Contents 1 Introduction 2 Proposed Project Design Changes 2.1 Agency's Analysis of Changes 3 Potential Adverse Environmental Effects from Proposed Project Changes 3.1 Health of Indigenous Peoples – Air Quality 3.1.1 Proponent's Assessment 3.1.2 Agency's Analysis and Conclusions 3.2 Migratory Birds and Species at Risk 3.2.1 Proponent's ...

Document Analysis of BC Hydro's Proposed Changes to the Halfway River Bridge Design for the Site C Clean Energy Project (see reference document #2828)

  • Project Site C Clean Energy Project
  • Document Category: Additional Information
  • Reference Number: 2829
  • Updated: 2018-10-30
  • Document: 125927E.pdf
  • Relevance: 237.2
  • Analysis of BC Hydro’s Proposed Changes to the Halfway River Bridge Design for the Site C Clean Energy Project October 2018 2 | P a g e Table of Contents 1 Introduction ................................................................................................................................ 3 2 Proposed Project Design Changes ............................................................................................ 4 2.1 Agency’s Analysis of Changes ...
1 alternate format found
English HTML
  • Relevance: 237.2
  • Analysis of BC Hydro's Proposed Changes to the Halfway River Bridge Design for the Site C Clean Energy Project October 2018 Table of Contents 1 Introduction 2 Proposed Project Design Changes 2.1 Agency's Analysis of Changes 3 Potential Adverse Environmental Effects from Proposed Project Changes 3.1 Fish and Fish Habitat 3.1.1 Proponent's Assessment 3.1.2 Agency's Analysis and Conclusions 3.2 Migratory Birds and Species at Risk 3.2.1 Proponent's Assessment 3.2.2 ...