Hardrock Gold Mine Project

Registry Search Mobile

Registry Search

Skip to Filters

107 results

Document Analysis of Greenstone Goldmines' Proposed Changes to the Hardrock Gold Mine Project (Updated February 5, 2021)

  • Project Hardrock Deposit Project
  • Document Category: Additional Information
  • Reference Number: 44
  • Updated: 2021-02-10
  • Document: 138040E.pdf
  • Relevance: 296.07
  • Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada ANALYSIS OF GREENSTONE GOLD MINES ’ PROPOSED CHANGES TO THE HARDROCK GOLD MINE PROJECT FEBRUARY 2021 ii © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2020. Catalogue No: En106-235/2021E-PDF ISBN: ...
3 alternate formats found
English HTML
  • Relevance: 296.07
  • Analysis of Greenstone Gold Mines' Proposed Changes to the Hardrock Gold Mine Project February 2021 © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2020. Catalogue No: En106-235/2021E-PDF ISBN: 978-0-660-37076-7 This publication may be reproduced in whole or in part for non-commercial purposes, and in any format, without charge or further permission. Unless otherwise specified, you may not reproduce materials, in whole or in ...
French HTML
  • Relevance: 245.07
  • Analyse des changements proposés par Greenstone Gold Mine au projet de mine d'or Hardrock Février 2021 © Sa Majesté la Reine du chef du Canada, représentée par la ministre de l'Environnement et du Changement Climatique, 2020. No de catalogue : En106-235/2021F-PDF ISBN : 978-0-660-37077-4 Cette publication peut être reproduite sans autorisation pour usage personnel, à condition que la source en soit clairement indiquée. Toutefois, la reproduction multiple de cette publication en tout ...
French PDF
  • Relevance: 245.07
  • Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada ANALYSE DES CHANGEMENTS PROPOSÉS PAR GREENSTONE GOLD MINE AU PROJET DE MINE D’OR HARDROCK FÉVRIER 2021 ii © Sa Majesté la Reine du chef du Canada, représentée par la ministre de l’Environnement et du Changement Climatique, 2020. No de catalogue : En106-235/2021F-PDF ISBN : 978-0-660-37077-4 ...

Document Amended Decision Statement

  • Project Hardrock Deposit Project
  • Document Category: Additional Information
  • Reference Number: 45
  • Updated: 2021-02-10
  • Document: 138041E.pdf
  • Relevance: 296.07
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill ...
3 alternate formats found
English HTML
  • Relevance: 296.07
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill located approximately ...
French HTML
  • Relevance: 245.07
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Greenstone Gold Mines a/s de Stephen Lines, Gestionnaire, Évaluation environnementale et réglementation 2381 Bristol Circle, Bureau B203 Oakville (Ontario) L6H 5S9 pour le Projet de mine d'or Hardrock Description du projet désigné Greenstone Gold Mines propose la construction, l'exploitation, la désaffectation et la fermeture d'une mine d'or à ciel ouvert et ...
French PDF
  • Relevance: 245.07
  • Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Greenstone Gold Mines a/s de Stephen Lines, Gestionnaire, Évaluation environnementale et réglementation 2381 Bristol Circle, Bureau B203 Oakville (Ontario) L6H 5S9 pour le Projet de mine d’or Hardrock Description du projet désigné Greenstone Gold Mines propose la construction, l'exploitation, la désaffectation et la fermeture d'une ...

Document Draft Analysis of Greenstone Gold Mines Proposed Changes to the Hardrock Gold Mine Project

  • Project Hardrock Deposit Project
  • Document Category: Additional Information
  • Reference Number: 41
  • Updated: 2020-11-24
  • Document: 136686E.pdf
  • Relevance: 290.27
  • Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada DRAFT ANALYSIS OF GREENSTONE GOLD MINES ’ PROPOSED CHANGES TO THE HARDROCK GOLD MINE PROJECT NOVEMBER 2020 ii Table of Contents 1. Introduction ................................................................................................................................................ 1 2. Proposed Project Changes ...
1 alternate format found
French PDF
  • Relevance: 239.27
  • Agence d’évaluation d’impact du Canada Impact Assessment Agency of Canada Agence d’évaluation d’impact du Canada ANALYSE PRÉLIMINAIRE DES CHANGEMENTS PROPOSÉS PAR GREENSTONE GOLD MINE AU PROJET DE MINE D’OR HARDROCK NOVEMBRE 2020 ii Table des matières 1. Introduction ................................................................................................................................................ 1 2. Changements proposés au ...

Document Public Notice - Public Comments Invited

  • Project Hardrock Deposit Project
  • Document Category: For Public Participation
  • Reference Number: 39
  • Updated: 2020-11-24
  • Document: 136942E.html
  • Relevance: 290.27
  • Public Notice Hardrock Gold Mine Project — Public Comments Invited What is happening? November 24, 2020 — The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Hardrock Gold Mine Project, an open-pit gold mine and on-site metal mill located approximately five kilometres south of Geraldton, Ontario. Why is the Agency holding a public comment period? In December 2018, the Minister of Environment and Climate ...
1 alternate format found
French HTML
  • Relevance: 239.27
  • Avis public Projet de mine d'or Hardrock — Période de consultation publique Que se passe-t-il? Le 24 novembre 2020 — L'Agence d'évaluation d'impact du Canada (l'Agence) lance une période de consultation publique dans le cadre de la phase suivant la décision relative au projet de mine d'or Hardrock, une mine d'or à ciel ouvert et d'un concentrateur de métaux sur place à environ cinq kilomètres au sud de Geraldton, en Ontario. Pourquoi l'Agence tient-elle une période de consultation ...

Document News Release - Public Comments Invited

  • Project Hardrock Deposit Project
  • Document Category: News Releases
  • Reference Number: 40
  • Updated: 2020-11-24
  • Document: 136940E.html
  • Relevance: 290.27
  • News Release Hardrock Gold Mine Project — Public Comments Invited November 24, 2020 — Ottawa — Impact Assessment Agency of Canada The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Hardrock Gold Mine Project, an open-pit gold mine and on-site metal mill located approximately five kilometres south of Geraldton, Ontario. In December 2018, the Minister of Environment and Climate Change approved the Hardrock Gold ...
1 alternate format found
French HTML
  • Relevance: 239.27
  • Communiqué de presse Projet de mine d'or Hardrock — Période de consultation publique Le 24 novembre 2020 — Ottawa — Agence d'évaluation d'impact du Canada L'Agence d'évaluation d'impact du Canada (l'Agence) lance une période de consultation publique dans le cadre de la phase suivant la décision relative au projet de mine d'or Hardrock, une mine d'or à ciel ouvert et d'un concentrateur de métaux sur place à environ cinq kilomètres au sud de Geraldton, en Ontario. En décembre 2018, la ...

Document Amended Decision Statement

  • Project Hardrock Deposit Project
  • Document Category: Additional Information
  • Reference Number: 42
  • Updated: 2018-12-10
  • Document: 152351E.html
  • Relevance: 245.59
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill located approximately ...
1 alternate format found
English PDF
  • Relevance: 245.59
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill ...

Document Environmental Assessment Decision Statement

  • Project Hardrock Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 36
  • Updated: 2018-12-10
  • Document: 128173E.html
  • Relevance: 245.59
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill located approximately five ...
1 alternate format found
English PDF
  • Relevance: 245.59
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill ...

Document Environmental Assessment Report

  • Project Hardrock Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 35
  • Updated: 2018-11-29
  • Document: 129183E.html
  • Relevance: 245.03
  • Hardrock Gold Mine Project – Environmental Assessment Report © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2018. Catalogue No: En106-214/2018E-PDF ISBN : 978-0-660-27868-1 This publication may be reproduced in whole or in part for non-commercial purposes, and in any format, without charge or further permission. Unless otherwise specified, you may not reproduce materials, in whole or in part, for the purpose of commercial ...
1 alternate format found
English PDF
  • Relevance: 245.03
  • Hardrock Gold Mine Project Environmental Assessment Report November 2018 Hardrock Gold Mine Project Draft Environmental Assessment Report Environmental Assessment Report – Hardrock Gold Mine Project ii © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2018. Catalogue No: En106-214/2018E-PDF ISBN : 978-0-660-27868-1 This publication may be reproduced in whole or in part for non-commercial ...

Document Draft Environmental Assessment Report

  • Project Hardrock Gold Mine Project
  • Document Category: For Public Participation
  • Reference Number: 33
  • Updated: 2018-10-01
  • Document: 126838E.html
  • Relevance: 242.04
  • Hardrock Gold Mine Project Draft Environmental Assessment Report October 2018 © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2018. Catalogue No: EnXXX-XXX/XXXXF ISBN: XXX-X-XXX-XXXXX-X This publication may be reproduced in whole or in part for non-commercial purposes, and in any format, without charge or further permission. Unless otherwise specified, you may not reproduce materials, in whole or in part, for the purpose of ...
1 alternate format found
English PDF
  • Relevance: 242.04
  • Hardrock Gold Mine Project Draft Environmental Assessment Report October 2018 © Her Majesty the Queen in Right of Canada, represented by the Minister of Environment and Climate Change, 2018. Catalogue No: EnXXX-XXX/XXXXF ISBN : XXX-X-XXX-XXXXX-X This publication may be reproduced in whole or in part for non-commercial purposes, and in any format, without charge or further permission. Unless otherwise specified, you may not reproduce ...

Document Potential Environmental Assessment Conditions

  • Project Hardrock Gold Mine Project
  • Document Category: For Public Participation
  • Reference Number: 34
  • Updated: 2018-10-01
  • Document: 125442E.pdf
  • Relevance: 242.04
  • ...
1 alternate format found
English HTML
  • Relevance: 242.04
  • Potential conditions under the Canadian Environmental Assessment Act, 2012 The Canadian Environmental Assessment Agency is contemplating the following potential conditions in relation to the Hardrock Gold Mine Project (the Designated Project) located in Ontario for recommendation to the Minister of Environment and Climate Change (the Minister) for inclusion in a Decision Statement issued under the Canadian Environmental Assessment Act, 2012. If the Minister decides that the carrying out of ...

Document From the Canadian Environmental Assessment Agency to Greenstone Gold Mines re: Conformity of Updated Responses to Information Requests Related to the Environmental Impact Statement Round 2 (Part 1) (see reference document # 28)

  • Project Hardrock Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 29
  • Updated: 2018-06-18
  • Document: 123007E.pdf
  • Relevance: 237
1 alternate format found
English HTML
  • Relevance: 237
  • From the Canadian Environmental Assessment Agency to Greenstone Gold Mines re: Conformity of Updated Responses to Information Requests Related to the Environmental Impact Statement Round 2 (Part 1) (see reference document # 28) Canadian Environmental Assessment Agency Ontario Region 55 York Street, Suite 600 Toronto ON M5J 1R7 Agence canadienne d'évaluation environnmentale Région de l'Ontario 55, rue York, bureau 600 Toronto ON M5J 1R7 June 18, 2018 Sent by E-mail Steve ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Participation Notice Display Filters

Date modified: