Milton Logistics Hub Project

Registry Search Mobile

Registry Search

Skip to Filters

1815 results

Document Notice of Updated Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1146
  • Document Date: 2025-09-25
  • Document: 163330E.html
  • Relevance: 377.79
  • Notice of Updated Decision Statement   Ottawa — October 10, 2025 — The Impact Assessment Agency of Canada (IAAC) has published an updated Decision Statement for the Milton Logistics Hub Project (the project), following a notice of change submitted by the Canadian National Railway Company (CN) on August 5, 2025. CN proposed a change to the material of the project's fire water tank, from steel to fiber-reinforced plastic. IAAC reviewed the proposed change and determined that it would result ...
1 alternate format found
French HTML
  • Relevance: 326.79
  • Avis de mise à jour de la déclaration de décision   Ottawa – 10 octobre 2025 – L'Agence d'évaluation d'impact du Canada (AEIC ) a publié une version mise à jour de la déclaration de décision pour le projet de pôle logistique de Milton à la suite d'un avis de modification soumis par la Compagnie des chemins de fer nationaux du Canada (CN) le 5 août 2025. La CN a proposé de modifier le matériau du réservoir d'eau du projet en cas d'incendie, qui serait fait de plastique renforcé de fibres ...

Document Updated Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1143
  • Document Date: 2025-09-03
  • Document: 163647E.html
  • Relevance: 375.54
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Janet Drysdale, Interim Chief Commercial Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of an intermodal logistics hub designed to transfer ...
3 alternate formats found
English PDF
  • Relevance: 375.54
  • 1 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Janet Drysdale, Interim Chief Commercial Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of an intermodal logistics hub ...
French PDF
  • Relevance: 324.54
  • 1 Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Compagnie des chemins de fer nationaux du Canada a/s Janet Drysdale, Cheffe des Affaires commerciales par intérim 16ième étage, 935 rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 pour le Projet de pôle logistique de Milton Description du projet désigné La Compagnie des chemins de fer nationaux du Canada propose de construire et d'exploiter ...
French HTML
  • Relevance: 324.54
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Compagnie des chemins de fer nationaux du Canada a/s Janet Drysdale, Cheffe des Affaires commerciales par intérim 16ième étage, 935 rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 pour le Projet de pôle logistique de Milton Description du projet désigné La Compagnie des chemins de fer nationaux du Canada propose de construire et d'exploiter un pôle ...

Document Using Reinforced Plastic Fire Water Tank Instead of Steel

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1145
  • Document Date: 2025-08-05
  • Document: 163038E.pdf
  • Relevance: 372.58
  • CN Milton Logistics Hub – Using Reinforced Plastic Fire Water Tank Instead of Steel August 5, 2025 File: 160901185 Prepared for: Canadian National Railway Company 935 de La Gauchetière Street W Montréal, Québec, H3B 2M9 Prepared by: Stantec Consulting Ltd 100-300 Hagey Boulevard Waterloo ON N2L 0A4 CN Milton Logistics Hub Using Reinforced Plastic Fire Water Tank Instead of Steel August 5, 2025 Table of Contents 1.0 INTRODUCTION ...
1 alternate format found
French PDF
  • Relevance: 321.58
  • Centre logistique CN Milton – Utilisation d’un réservoir d’eau d’incendie en plastique renforcé au lieu de l’acier 5 août 2025 Fichier: 160901185 Préparé pour : Compagnie des chemins de fer nationaux du Canada 935, rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 Préparé par : Stantec Experts-conseils Ltée 100-300, boulevard Hagey Waterloo (Ontario) N2L 0A4 Les documents traduits pourraient ne pas être fiables parce que leur exactitude ...

Document Updated Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1140
  • Document Date: 2025-01-06
  • Document: 161282E.pdf
  • Relevance: 351.83
  • 1 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Janet Drysdale, Senior Vice-President and Chief Stakeholder Relations Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of ...
1 alternate format found
French PDF
  • Relevance: 300.83
  • 1 Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Compagnie des chemins de fer nationaux du Canada a/s Janet Drysdale, Première vice-présidente et cheffe Relations avec les intervenants 16ième étage, 935 rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 pour le Projet de pôle logistique de Milton Description du projet désigné La Compagnie des chemins de fer nationaux du Canada propose de ...

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1137
  • Document Date: 2024-07-18
  • Document: 158110E.html
  • Relevance: 335.9
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 284.9
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Document Inspection summary

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1139
  • Document Date: 2023-09-12
  • Document: 158934E.pdf
  • Relevance: 309.45
  • 160 Elgin St., 24th floor 160, rue Elgin, 24e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic INSPECTION SUMMARY Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: September 12, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics ...
1 alternate format found
English HTML
  • Relevance: 309.45
  • Inspection Summary Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: September 12, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics hub designed to transfer containers between trucks and railcars in an area of rapid urban growth. The Project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about ...

Document Inspection summary

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1138
  • Document Date: 2023-04-20
  • Document: 158933E.pdf
  • Relevance: 298.06
  • 160 Elgin St., 24th floor 160, rue Elgin, 24e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic INSPECTION SUMMARY Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: April 20, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics hub ...
1 alternate format found
English HTML
  • Relevance: 298.06
  • Inspection Summary Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: April 20, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics hub designed to transfer containers between trucks and railcars in an area of rapid urban growth. The Project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about 50 ...

Document Inspection Summaries

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1134
  • Document Date: 2023-03-31
  • Document: 151969E.html
  • Relevance: 296.54
  • Inspection Summaries On-site Inspection Summary - 2021-12-15 (PDF – 140 KB) On-site Inspection Summary - 2022-03-03 (PDF – 140 KB) On-site Inspection Summary - 2022-06-02 (PDF – 253 KB) On-site Inspection Summary - 2022-10-12 (PDF – 253 KB) On-site Inspection Summary - 2023-04-20 (PDF – 139 KB)
1 alternate format found
French HTML
  • Relevance: 245.54
  • Résumés d'inspection Résumé de l'inspection - 2021-12-15 (PDF – 140 KB) Résumé de l'inspection - 2022-03-03 (PDF – 140 KB) Résumé de l'inspection - 2022-06-02 (PDF – 253 KB) Résumé de l'inspection - 2022-10-12 (PDF – 253 KB) Résumé de l'inspection - 2023-04-20 (PDF – 139 KB)

Document Amended Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1132
  • Document Date: 2022-07-26
  • Document: 144613E.pdf
  • Relevance: 278.68
  • 1 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Sean Finn, Executive Vice-President, Corporate Services and Chief Legal Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of ...
3 alternate formats found
English HTML
  • Relevance: 278.68
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Sean Finn, Executive Vice-President, Corporate Services and Chief Legal Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of an intermodal ...
French PDF
  • Relevance: 227.68
  • 1 Déclaration de décision Émise aux termes de l’article 54 de la Loi canadienne sur l’évaluation environnementale (2012) à Compagnie des chemins de fer nationaux du Canada a/s Sean Finn, Vice-président exécutif, Services corporatifs et chef de la direction des Affaires juridiques 16ième étage, rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 pour le Projet de pôle logistique de Milton Description du projet désigné La Compagnie des chemins de fer nationaux du ...
French HTML
  • Relevance: 227.68
  • Déclaration de décision Émise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Compagnie des chemins de fer nationaux du Canada a/s Sean Finn, Vice-président exécutif, Services corporatifs et chef de la direction des Affaires juridiques 16ième étage, rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 pour le Projet de pôle logistique de Milton Description du projet désigné La Compagnie des chemins de fer nationaux du Canada propose de ...

Document Analysis of Canadian National Railway Company's Proposed Changes to the Milton Logistics Hub Project

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1131
  • Document Date: 2022-07-26
  • Document: 144612E.pdf
  • Relevance: 278.68
  • 1 Impact Assessment Agency of Canada ANALYSIS OF CANADIAN NATIONAL RAILWAY COMPANY ’S PROPOSED CHANGES TO THE MILTON LOGISTICS HUB PROJECT (PIPELINE RECONFIGURATION) JULY 2022 2 Table of Contents Impact Assessment Agency of Canada ............................................................................................................... 1 Table of Contents ...
1 alternate format found
French PDF
  • Relevance: 227.68
  • 1 Agence d’évaluation d’impact du Canada ANALYSE DES CHANGEMENTS PROPOSÉS PAR LA COMPAGNIE DES CHEMINS DE FER NATIONAUX DU CANADA AU PROJET DE PÔLE LOGISTIQUE DE MILTON (RECONFIGURATION DE PIPELINES) JUILLET 2022 2 Table des matières Agence d’évaluation d’impact du Canada ............................................................................................................ 1 Table des matières ...

Document Public Notice - Public Comments Invited on Proposed Amendments to the Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: For Public Participation
  • Reference Number: 1121
  • Document Date: 2022-06-06
  • Document: 143989E.html
  • Relevance: 275.3
  • Public Notice Milton Logistics Hub Project Public Comments Invited on Proposed Amendments to the Decision Statement What is happening? June 6, 2022 — The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Milton Logistics Hub Project, a container logistics hub located in Milton, Ontario. Why is the Agency holding a public comment period? The former Minister of Environment and Climate Change approved the ...
1 alternate format found
French HTML
  • Relevance: 224.3
  • Avis Public Projet de pôle logistique de Milton Période de consultation publique sur les modifications proposées à la déclaration de décision De quoi s'agit-il? Le 6 juin 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) organise une période de consultation dans le cadre de l'étape postérieure à la décision pour le projet de pôle logistique de Milton, un pôle logistique consacré au transfert de conteneurs à Milton, en Ontario. Pourquoi l'Agence tient-elle une période de ...

Document Draft Analysis of Canadian National Railway Company's Proposed Changes to the Milton Logistics Hub Project

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1122
  • Document Date: 2022-06-06
  • Document: 144017E.pdf
  • Relevance: 275.3
  • 1 Impact Assessment Agency of Canada DRAFT ANALYSIS OF CANADIAN NATIONAL RAILWAY COMPANY ’S PROPOSED CHANGES TO THE MILTON LOGISTICS HUB PROJECT (PIPELINE RECONFIGURATION) JUNE 2022 2 Table of Contents Table of Contents ............................................................................................................................................. 2 Tables ...
1 alternate format found
French PDF
  • Relevance: 224.3
  • 1 Agence d’évaluation d’impact du Canada ANALYSE PRÉLIMINAIRE DES CHANGEMENTS PROPOSÉS PAR LA COMPAGNIE DES CHEMINS DE FER NATIONAUX DU CANADA AU PROJET DE PÔLE LOGISTIQUE DE MILTON (RECONFIGURATION DE PIPELINES) JUIN 2022 2 Table des matières Table des matières ........................................................................................................................................... 2 Tableaux ...

Document Minister's Environmental Assessment Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1119
  • Document Date: 2021-01-21
  • Document: 137964E.html
  • Relevance: 245.6
  • Decision Statement issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Sean Finn, Executive Vice-President, Corporate Services and Chief Legal Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of an intermodal logistics ...
1 alternate format found
English PDF
  • Relevance: 245.6
  • 1 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Canadian National Railway Company c/o Sean Finn, Executive Vice-President, Corporate Services and Chief Legal Officer 16th Floor, 935 de La Gauchetière Street West Montreal, Quebec H3B 2M9 for the Milton Logistics Hub Project Description of the Designated Project The Canadian National Railway Company (the Proponent) is proposing the construction and operation of an ...

Document Draft Potential Conditions

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 990
  • Document Date: 2020-07-02
  • Document: 135436E.html
  • Relevance: 235.72
  • Potential conditions under the Canadian Environmental Assessment Act, 2012 The Impact Assessment Agency of Canada is contemplating the following potential conditions in relation to the Milton Logistic Hub Project (the Designated Project) located in Ontario for recommendation to the Minister of Environment and Climate Change (the Minister) for inclusion in a Decision Statement issued under the Canadian Environmental Assessment Act, 2012. If the Minister decides ...
1 alternate format found
English PDF
  • Relevance: 235.72
  • 1 Potential conditions under the Canadian Environmental Assessment Act, 2012 The Impact Assessment Agency of Canada is contemplating the following potential conditions in relation to the Milton Logistic Hub Project (the Designated Project) located in Ontario for recommendation to the Minister of Environment and Climate Change (the Minister) for inclusion in a Decision Statement issued under the Canadian Environmental Assessment Act, 2012. If the Minister decides that the carrying ...