Document Notice of Termination

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 342
  • Updated: 2023-09-26
  • Document: 153071E.html
  • Relevance: 378.98
  • Notice of Termination Ottawa — September 26, 2023 — The Impact Assessment Agency of Canada (the Agency) has terminated the environmental assessment of the Beaver Dam Mine Project (the project) pursuant to section 62 of the Canadian Environmental Assessment Act, 2012. Atlantic Mining Nova Scotia Inc., a wholly owned subsidiary of St Barbara Limited (formerly named Atlantic Gold Corp.), notified the Agency that they wish to terminate the federal environmental assessment for the project.
1 alternate format found
French HTML
  • Relevance: 327.98
  • Avis de cessation Ottawa — 26 septembre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) a mis fin à l'évaluation environnementale du projet de la mine Beaver Dam (le projet) en vertu de l'article 62 de la Loi canadienne sur l'évaluation environnementale (2012). Atlantic Mining NS Inc., une filiale à part entière de St Barbara Limited Corp.) (anciennement dénommée Atlantic Gold Corp.), a informé l'Agence qu'elle souhaite mettre fin à l'évaluation environnementale fédérale du ...

Document Notice of Time Limit Extension

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 332
  • Updated: 2022-08-17
  • Document: 144818E.html
  • Relevance: 339.58
  • Notice of Time Limit Extension Ottawa — August 17, 2022 — The Impact Assessment Agency of Canada (the Agency) granted an extension to the three-year time limit for Atlantic Mining NS Inc. (the proponent) to provide the required information or studies described in the Final Environmental Impact Statement Guidelines for the environmental assessment of the Beaver Dam Mine Project. The Agency has taken this action further to a written request from the proponent that the time limit be extended ...
1 alternate format found
French HTML
  • Relevance: 288.58
  • Avis de prolongation du délai Ottawa — 17 août 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) a accordé une prolongation du délai de trois ans dont dispose Atlantic Mining NS Inc. (le promoteur) pour fournir les études ou renseignements demandés, décrits dans la version définitive des lignes directrices relatives à l'étude d'impact environnemental du Projet de la mine Beaver Dam. L'Agence a pris cette mesure après avoir reçu du promoteur une demande écrite de prolongation du ...

Document Public Notice - Public Comments Invited on a Revised Summary of the Environmental Impact Statement

  • Project Beaver Dam Mine Project
  • Document Category: For Public Participation
  • Reference Number: 49
  • Updated: 2021-11-16
  • Document: 142249E.html
  • Relevance: 315.71
  • Public Notice Beaver Dam Mine Project — Public Comments Invited   November 30, 2021 — The deadline to submit comments has been extended from December 16, 2021, to December 17, 2021. The Agency is aware that some people may not have been able to provide comments or access the Registry Internet site due to a technical issue that occurred between November 28 and November 29. The issue is now resolved. As a result, the Agency has extended the deadline for the submission of public comments to ...
1 alternate format found
French HTML
  • Relevance: 264.71
  • Avis public Projet de la mine Beaver Dam — Période de consultation publique   Le 30 novembre 2021 — La date limite pour présenter des commentaires a été reportée du 16 décembre 2021 au 17 décembre 2021. L'Agence est consciente que certaines personnes n'ont possiblement pas été en mesure de présenter des commentaires ou d'accéder au site Internet du Registre en raison d'un problème technique survenu du 28 novembre au 29 novembre. Le problème est maintenant résolu. En conséquence, l'Agence ...

Document Revised Summary of the Environmental Impact Statement

  • Project Beaver Dam Mine Project
  • Document Category: For Public Participation
  • Reference Number: 52
  • Updated: 2021-10-29
  • Document: 141952E.pdf
  • Relevance: 314.22
  • Beaver Dam Mine Project Environmental Impact Statement Summary October 2021 Submitted to the Impact Assessment Agency of Canada and Nova Scotia Environment Atlantic Mining NS Inc. 409 Billybell Way, Mooseland Middle Musquodoboit, Nova Scotia, Canada B0N 1X0 Tel+902.384.2772, Fax +902.384.2259 A wholly owned subsidiary of St Barbara Limited www.stbarbara.com.au Beaver Dam Mine Project 2021 Environmental Impact Statement Summary | October ...
1 alternate format found
French PDF
  • Relevance: 263.22
  • Projet de la mine Beaver Dam Résumé de l’étude d’impact environnemental Octobre 2021 Soumis à l’Agence d’évaluation d’impact du Canada et au ministère de l’Environnement de la Nouvelle-Écosse Atlantic Mining NS Inc. 409 Billybell Way, Mooseland Middle Musquodoboit, Nouvelle-Écosse, Canada B0N 1X0 Tél. +902 384-2772, Téléc. +902 384-2259 Filiale en propriété exclusive de St Barbara Limited www.stbarbara.com.au Résumé de l’étude d’impact ...

Document Public Notice - Participant Funding Available

  • Project Beaver Dam Mine Project
  • Document Category: For Public Participation
  • Reference Number: 44
  • Updated: 2021-02-10
  • Document: 138035E.html
  • Relevance: 293.72
  • Public Notice Beaver Dam Mine Project - Participant Funding Available February 10, 2021 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the federal environmental assessment for the proposed Beaver Dam Mine Project, located in Marinette, Nova Scotia. Funding is available for eligible individuals and groups to assist their participation in upcoming steps of the environmental assessment. These ...
1 alternate format found
French HTML
  • Relevance: 242.72
  • Avis public Projet de la mine Beaver Dam - Disponibilité d'une aide financière aux participants Le 10 février 2021 — Une aide financière fournie par l'Agence d'évaluation d'impact du Canada (l'Agence) est mise à la disposition du public et des groupes autochtones pour favoriser leur participation à l'évaluation environnementale fédérale du projet de la mine Beaver Dam, situé à Marinette, en Nouvelle-Écosse. Cette aide financière est mise à la disposition des particuliers et des groupes ...

Document News Release - Participant Funding Available

  • Project Beaver Dam Mine Project
  • Document Category: News Releases
  • Reference Number: 45
  • Updated: 2021-02-10
  • Document: 138036E.html
  • Relevance: 293.72
  • News Release Beaver Dam Mine Project — Participant Funding Available February 10, 2021 — Ottawa — Impact Assessment Agency of Canada Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the federal environmental assessment for the proposed Beaver Dam Mine Project, an open pit gold mine located in Marinette, Nova Scotia. Funding is available for eligible individuals and groups to assist their ...
1 alternate format found
French HTML
  • Relevance: 242.72
  • Communiqué de presse Projet de la mine Beaver Dam — Disponibilité d'une aide financière aux participants Le 10 février 2021 — Ottawa — Agence d'évaluation d'impact du Canada Une aide financière fournie par l'Agence d'évaluation d'impact du Canada (l'Agence) est mise à la disposition du public et des groupes autochtones pour favoriser leur participation à l'évaluation environnementale fédérale du projet de la mine Beaver Dam, une mine d'or à ciel ouvert située à Marinette, en ...

Document From the Canadian Environmental Assessment Agency to Atlantic Gold Corporation re: Information Requests Round 1 (Part 2)

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 23
  • Updated: 2017-08-21
  • Document: 120097E.pdf
  • Relevance: 223.21
  • From: Scotney,Nicole [CEAA] Sent: August 21, 2017 2:49 PM To: Maryse Belanger; James Millard Cc: BD Mine / Mine BD (CEAA/ACEE); Atkinson,Mike [CEAA]; Peter Oram; Meghan Malloy; Gregus,Emily [CEAA]; Tutty, Bridget R Subject: Information Requirements (Part II) following review of EIS - Beaver Dam Mine Project Good afternoon Maryse and Jim, In addition to the email below and Round 1, Part 1 of Information Requirements (IRs) for the Beaver Dam Mine Project, please find Part 2 of the ...
1 alternate format found
English HTML
  • Relevance: 223.21
  • From the Canadian Environmental Assessment Agency to Atlantic Gold Corporation re: Information Requests Round 1 (Part 2) From: Scotney,Nicole [CEAA] Sent: August 21, 2017 2:49 PM To: Maryse Belanger; James Millard Cc: BD Mine / Mine BD (CEAA/ACEE); Atkinson,Mike [CEAA]; Peter Oram; Meghan Malloy; Gregus,Emily [CEAA]; Tutty, Bridget R Subject: Information Requirements (Part II) following review of EIS - Beaver Dam Mine Project Good afternoon Maryse and Jim, In addition to the email ...

Document From the Canadian Environmental Assessment Agency to Atlantic Gold Corporation re: Information Requests Round 1 (Part 1)

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 22
  • Updated: 2017-08-09
  • Document: 120096E.pdf
  • Relevance: 222.77
  • From: Scotney,Nicole [CEAA] Sent: August 9, 2017 4:20 PM To: Maryse Belanger; James Millard Cc: BD Mine / Mine BD (CEAA/ACEE); Atkinson,Mike [CEAA]; Peter Oram; Meghan Malloy; Gregus,Emily [CEAA]; Tutty, Bridget R Subject: Information Requests (Part I) following review of EIS - Beaver Dam Mine Project Dear Maryse and Jim, The Canadian Environmental Assessment Agency (the Agency) has completed its technical review of the Environmental Impact Statement (EIS) and associated EIS ...
1 alternate format found
English HTML
  • Relevance: 222.77
  • From the Canadian Environmental Assessment Agency to Atlantic Gold Corporation re: Information Requests Round 1 (Part 1) From: Scotney,Nicole [CEAA] Sent: August 9, 2017 4:20 PM To: Maryse Belanger; James Millard Cc: BD Mine / Mine BD (CEAA/ACEE); Atkinson,Mike [CEAA]; Peter Oram; Meghan Malloy; Gregus,Emily [CEAA]; Tutty, Bridget R Subject: Information Requests (Part I) following review of EIS - Beaver Dam Mine Project Dear Maryse and Jim, The Canadian Environmental Assessment Agency ...