Barge Ramp Beam Installation

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Barge Ramp Beam Installation

  • Project Barge Ramp Beam Installation
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-04-02
  • Document: 135463E.html
  • Relevance: 273.24
  • Notice of Determination Berry Point, Burnaby, B.C. –April 2, 2020– The Vancouver Fraser Port Authority has determined that the proposed Barge Ramp Beam Installation is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community knowledge Comments received from the public Technically and economically feasible mitigation ...
1 alternate format found
French HTML
  • Relevance: 222.24
  • Avis de détermination Berry Point, Burnaby (C.-B.) – Le 2 avril 2020 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet d'installation d'un tablier pour la rampe pour barges n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants : Effets sur les droits des peuples autochtones Connaissances autochtones Connaissances communautaires Commentaires ...

Document Barge Ramp Beam Installation

  • Project Barge Ramp Beam Installation
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-02-24
  • Document: 133971E.html
  • Relevance: 270.76
  • Barge Ramp Beam Installation – Public Comments Invited February 20, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Barge Ramp Beam Installation, located at Island Tug and Barge's Berry Point facility in Burnaby is likely to cause significant adverse ...
1 alternate format found
French HTML
  • Relevance: 219.76
  • Installation d'une poutre pour la rampe pour chalands – Le public est invité à formuler des commentaires. Le 20 février 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la mise en place proposée d'une poutre pour la rampe pour ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: