Replacement of the Fuel Transfer Station and Fuel Tank Systems

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Replacement of the Fuel Transfer Station and Fuel Tank Systems
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-09-18
  • Document: 136039E.html
  • Relevance: 284.77
  • Notice of Determination September 18, 2020 – 17 Wing Detachment Dundurn, Saskatchewan The Department of National Defence has determined that the proposed replacement of the fuel transfer station and fuel tank systems at 17 Wing Winnipeg Detachment Dundurn is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National ...
1 alternate format found
French HTML
  • Relevance: 233.77
  • Avis de détermination Le 18 septembre 2020 – 17 Escadre, Détachement Dundurn (Saskatchewan) Le Ministère de la Défense nationale a déterminé que le projet proposé de remplacement de la station de transfert de carburant et des systèmes de réservoir de carburant n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et ...

Document Public Comment Period on Intent to Make a Determination

  • Project Replacement of the Fuel Transfer Station and Fuel Tank Systems
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-06-26
  • Document: 135222E.html
  • Relevance: 278.92
  • Public Comment Period on Intent to Make a Determination Replacement of the Fuel Transfer Station and Fuel Tank Systems June 26, 2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more ...
1 alternate format found
French HTML
  • Relevance: 227.92
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Remplacement de la station de transfert de carburant et des systèmes de réservoir de carburant Le 26  juin  2020 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: