Document Notice of Time Limit Extension

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 290
  • Updated: 2023-07-20
  • Document: 152377E.html
  • Relevance: 374.2
  • Notice of Time Limit Extension Ottawa — July 20, 2023 — On July 18, 2023, the Impact Assessment Agency of Canada (the Agency) granted an extension to the three-year time limit for GCT Canada Limited Partnership (the proponent) to provide the required information or studies set out in the notice of commencement of the impact assessment of GCT Deltaport Expansion – Berth Four Project. The Agency has taken this action following a written request from the proponent that the time limit be ...
1 alternate format found
French HTML
  • Relevance: 323.2
  • Avis de prolongation du délai Ottawa — 20 juillet 2023 — Le 18 juillet 2023, l'Agence d'évaluation d'impact du Canada (l'Agence) a accordé une prolongation du délai de trois ans dont disposait GCT Canada Limited Partnership (le promoteur) pour fournir les études ou renseignements mentionnés dans l'avis de lancement de l'évaluation d'impact du Projet d'agrandissement de Deltaport – quatrième poste d'amarrage de GCT. L'Agence a pris cette mesure à la suite d'une demande écrite (en anglais ...

Document Joint Guidelines (Updated September 1, 2022)

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 206
  • Updated: 2022-05-31
  • Document: 143950E.pdf
  • Relevance: 334.47
  • Joint Guidelines GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) Original Posting: May 31, 2022 Updated: September 1, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENTAL ASSE SSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT GUIDELINES I I Contents List of Tables ........................................................................................................... ...
1 alternate format found
English HTML
  • Relevance: 334.47
  • Joint Guidelines GCT Deltaport Expansion - Berth Four Project (DP4) May 31, 2022 (Updated September 1, 2022) Final Version Contents List of Tables List of Figures List of Appendices List of Abbreviations and Acronyms Symbols and Units of Measure Glossary Disclaimer Preface 1. Project Introduction and Overview 1.1. Proponent Information 1.2. Project Location 1.3. Matters and Factors to Be Considered in the Assessment 1.4. Gender-Based Analysis Plus (GBA Plus) 1.5. ...

Document Joint Assessment Plan

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 207
  • Updated: 2022-05-31
  • Document: 143951E.pdf
  • Relevance: 334.47
  • Joint Assessment Plan GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) May 31, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENT AL ASSESSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT ASSESSMENT PLAN I I Contents Glossary ...
1 alternate format found
English HTML
  • Relevance: 334.47
  • Joint Assessment Plan GCT Deltaport Expansion – Berth Four Project (DP4) May 31, 2022 Final Version Contents Glossary 1. Introduction 1.1. Project Background 1.2. Purpose of the Plan 2. Approach to Cooperation 2.1. Cooperation Agreement 2.2. Cooperation Opportunities 3. Indigenous Engagement 4. Public Participation 5. Assessment Process 5.1. Impact Statement Development and Review Phase 5.2. Impact Assessment Phase led by the Review Panel (Part 1) 5.3. Impact ...

Document Joint Permitting and Regulatory Coordination Plan

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 209
  • Updated: 2022-05-31
  • Document: 143953E.pdf
  • Relevance: 334.47
  • Joint Permitting / Regulatory Coordination Plan GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) May 31, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENT AL ASSESSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT PERMITTING / REGULATORY COORDINATION PLAN 2 1. Introduction 1.1 Project Background GCT Canada Limited Partnership (the proponent) is proposing to expand its ...
1 alternate format found
English HTML
  • Relevance: 334.47
  • Joint Permitting / Regulatory Coordination Plan GCT Deltaport Expansion – Berth Four Project (DP4) May 31, 2022 Final Version 1. Introduction 1.1 Project Background GCT Canada Limited Partnership (the proponent) is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia. The GCT Deltaport Expansion – Berth Four Project (the project) would add a fourth berth on the east side of the Roberts Bank ...