Waterloo Airport Runway Project

Registry Search Mobile

Registry Search

Skip to Filters

125 results

Document Notice of Impact Assessment Decision with Reasons

  • Project Waterloo Airport Runway Project
  • Document Category: Additional Information
  • Reference Number: 71
  • Updated: 2021-11-02
  • Document: 141727E.html
  • Relevance: 314.61
  • Notice of Impact Assessment Decision with Reasons Ottawa — November 2, 2021 — The Impact Assessment Agency of Canada (the Agency) has decided that an impact assessment is not required for the Waterloo Airport Runway Project (the Project) located in Ontario. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), the Agency has taken into account each of the following factors: the proponent's Detailed Project Description and its response to the Summary of Issues. The ...
1 alternate format found
French HTML
  • Relevance: 263.61
  • Avis de décision d'évaluation d'impact avec motifs Ottawa — le 2 novembre 2021 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de piste de l'aéroport de Waterloo (le projet) situé en Ontario. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a tenu compte de chacun des facteurs suivants : la description détaillée du projet du promoteur et sa réponse au résumé des enjeux. ...

Document Notice of Time Limit Resuming

  • Project Waterloo Airport Runway Project
  • Document Category: Additional Information
  • Reference Number: 66
  • Updated: 2021-09-17
  • Document: 141735E.html
  • Relevance: 310.84
  • Notice of Time Limit Resuming Ottawa — September 17, 2021 — On September 8, 2021, the Region of Waterloo International Airport (the proponent) provided its response to the Summary of Issues and Detailed Project Description for the Waterloo Airport Runway Project to the Impact Assessment Agency of Canada (the Agency). The proponent thereby completed the activity for which the proponent requested that the time limit be suspended on May 21, 2021, and the 180-day time limit has resumed as of ...
1 alternate format found
French HTML
  • Relevance: 259.84
  • Avis de reprise du délai Ottawa — 17 septembre 2021 — Le 8 septembre 2021, l'Aéroport international de la région de Waterloo (le promoteur) a fourni sa réponse au sommaire des questions et une description de projet détaillée pour le projet de piste de l'aéroport de Waterloo à l'Agence d'évaluation d'impact du Canada (l'Agence). Le promoteur a ainsi terminé l'activité pour laquelle le promoteur avait demandé (en anglais seulement) la suspension du délai le 21 mai 2021, et le délai de 180 jours ...

Document Supporting geospatial data - Detailed Project Description

  • Project Waterloo Airport Runway Project
  • Document Category: Geospatial data files
  • Reference Number: 72
  • Updated: 2021-09-15
  • Document: 146700E.html
  • Relevance: 310.68
  • Supporting geospatial data – Detailed Project Description Region of Waterloo International Airport has provided electronic geospatial data files on September 15, 2021, related to the Waterloo Airport Runway project. The dataset contains the following 1 layer for maps provided in the Detailed Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada. Layer Name Projection (name) Page number Site Boundary NAD 83 UTM Zone ...
1 alternate format found
French HTML
  • Relevance: 259.68
  • Données géospatiales connexes – Description détaillée du projet (anglais seulement) L'aéroport international de la région de Waterloo a fourni des fichiers électroniques de données géospatiales le 15 septembre 2021 liées au projet de piste de l'aéroport de Waterloo. L'ensemble de donnée contient 1 couche pour les cartes fournies dans la description détaillée du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – ...

Document Summary of the Detailed Project Description of a Designated Project

  • Project Waterloo Airport Runway Project
  • Document Category: Additional Information
  • Reference Number: 68
  • Updated: 2021-09-14
  • Document: 141331E.pdf
  • Relevance: 310.6
  • Waterloo Airport Runway Project Waterloo Region International Airport September 14, 2021 MTE File No.: 44941-100 Following the Requirements of the Impact Assessment Act Runway 14-32 Extension Detailed Project Description English Summary MTE Consultants | 44941-100 | Waterloo Region Airport Runway Extension DPD – Summary (English) | September, 2021 1 ENGLISH SUMMARY Introduction The Regional Municipality of Waterloo (Region) is planning the Runway 14-32 Extension ...
1 alternate format found
French PDF
  • Relevance: 259.6
  • À l’aéroport international de la région de Waterloo À l’aéroport international de la région de Waterloo 14 septembre, 2021 MTE File No.: 44941-100 Conformément aux exigences de la Loi sur l’analyse d’impact Prolongement de la piste 14-32 description détaillée du projet Résumé en Français Consultants MTE | 44941-100 | DDP du prolongement de piste de l'aéroport de Waterloo - Résumé - Français | Septembre 2021 1 RÉSUMÉ EN FRANÇAIS Introduction La municipalité régionale de ...

Document Notice of Time Limit Suspension with Reasons

  • Project Waterloo Airport Runway Project
  • Document Category: Additional Information
  • Reference Number: 56
  • Updated: 2021-05-27
  • Document: 139221E.html
  • Relevance: 301.86
  • Notice of Time Limit Suspension with Reasons Ottawa — May 27, 2021 — On May 21, 2021, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Region of Waterloo International Airport's (the proponent) Waterloo Airport Runway Project. The Agency has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have sufficient time to ...
1 alternate format found
French HTML
  • Relevance: 250.86
  • Avis de suspension du délai avec motifs Ottawa — 27 mai 2021 — Le 21 mai 2021, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours prévu pour l'étape préparatoire, en vertu de la Loi sur l'évaluation d'impact, pour le projet de piste de l'aéroport de Waterloo de l'aéroport international de la région de Waterloo (le promoteur). L'Agence a pris cette mesure à la suite d'une demande écrite du promoteur (en anglais seulement) visant à suspendre le délai, afin de ...

Document Summary of Issues

  • Project Waterloo Airport Runway Project
  • Document Category: Additional Information
  • Reference Number: 54
  • Updated: 2021-04-28
  • Document: 138893E.pdf
  • Relevance: 299.61
  • APRIL 28, 2021 – WATERLOO AIRPORT RUNWAY PROJECT – SUMMARY OF ISSUES – PAGE 1 OF 5 Waterloo Airport Runway Project - Summary of Issues This document provides a high-level summary of the issues submitted to the Impact Assessment Agency of Canada (the Agency) regarding the Waterloo Airport Runway Project (the Project) during the comment period on the Initial Project Description submitted by the Region of Waterloo International Airport (the proponent). The issues highlight information ...
1 alternate format found
French PDF
  • Relevance: 248.61
  • 28 AVRIL 2021 – PROJET DE PISTE DE L’AÉROPORT DE WATERLOO – SOMMAIRE DES QUESTIONS – PAGE 1 SUR 6 Projet de piste de l’aéroport de Waterloo – Sommaire des questions Le présent document fournit un résumé global des questions portées à l’attention de l’Agence d’évaluation d’impact du Canada (l’Agence) concernant le projet de piste de l’aéroport de Waterloo (le projet) pendant la période de consultation publique sur la description initiale du projet présentée par l’aéroport ...

Document Public Notice - Participant Funding Available

  • Project Waterloo Airport Runway Project
  • Document Category: For Public Participation
  • Reference Number: 6
  • Updated: 2021-03-22
  • Document: 138391E.html
  • Relevance: 296.79
  • Public Notice Waterloo Airport Runway Project — Participant Funding Available March 22, 2021 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the impact assessment process for the proposed Waterloo Airport Runway Project, located in Breslau, Ontario. Funding is available for eligible individuals and groups to assist their participation during the impact assessment's planning phase. During the ...
1 alternate format found
French HTML
  • Relevance: 245.79
  • Avis Public Projet de piste de l'aéroport de Waterloo — Disponibilité d'une aide financière aux participants Le 22 mars 2021 — Une aide financière fournie par l'Agence d'évaluation d'impact du Canada (l'Agence) est mise à la disposition du public et des groupes autochtones pour favoriser leur participation au processus d'évaluation d'impact du projet de piste de l'aéroport de Waterloo, situé à Breslau, en Ontario. L'aide financière est mise à la disposition des personnes et des groupes ...

Document News Release - Participant Funding Available

  • Project Waterloo Airport Runway Project
  • Document Category: News Releases
  • Reference Number: 5
  • Updated: 2021-03-22
  • Document: 138390E.html
  • Relevance: 296.79
  • News Release Waterloo Airport Runway Project — Participant Funding Available March 22, 2021 — Ottawa — Impact Assessment Agency of Canada Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the impact assessment process for the proposed Waterloo Airport Runway Project, located in Breslau, Ontario. Funding is available for eligible individuals and groups to assist their participation during the ...
1 alternate format found
French HTML
  • Relevance: 245.79
  • Communiqué de presse Projet de piste de l'aéroport de Waterloo — Disponibilité d'une aide financière aux participants Le 22 mars 2021 — Ottawa — Agence d'évaluation d'impact du Canada Une aide financière fournie par l'Agence d'évaluation d'impact du Canada (l'Agence) est mise à la disposition du public et des groupes autochtones pour favoriser leur participation au processus d'évaluation d'impact du projet de piste de l'aéroport de Waterloo, situé à Breslau, en Ontario. L'aide ...

Document News Release - Public Comments Invited on a Summary of the Initial Project Description

  • Project Waterloo Airport Runway Project
  • Document Category: News Releases
  • Reference Number: 3
  • Updated: 2021-03-19
  • Document: 138385E.html
  • Relevance: 296.56
  • News Release Waterloo Airport Runway Project — Public Comments Invited on the Summary of the Initial Project Description March 19, 2021 — Ottawa — Impact Assessment Agency of Canada The Impact Assessment Agency of Canada (the Agency) has accepted an initial project description for the proposed Waterloo Airport Runway Project, located in Breslau, Ontario. The Agency invites the public and Indigenous groups to review the summary of the initial project description and provide feedback ...
1 alternate format found
French HTML
  • Relevance: 245.56
  • Communiqué de presse Projet de piste de l'aéroport de Waterloo — Période de consultation publique sur le résumé de la description initial de projet Le 19 mars 2021 — Ottawa — Agence d'évaluation d'impact du Canada L'Agence d'évaluation d'impact du Canada (l'Agence) a accepté une description initiale du projet pour le projet de piste de l'aéroport de Waterloo, situé à Breslau, en Ontario. L'Agence invite le public et les groupes autochtones à examiner le résumé de la description initiale ...

Document Public Notice - Public Comments Invited on the Summary of the Initial Project Description

  • Project Waterloo Airport Runway Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Updated: 2021-03-19
  • Document: 138486E.html
  • Relevance: 296.56
  • Public Notice Waterloo Airport Runway Project — Public Comments Invited on the Summary of the Initial Project Description What is happening? March 19, 2021 — The Impact Assessment Agency of Canada (the Agency) has accepted an initial project description for the proposed Waterloo Airport Runway Project, located in Breslau, Ontario. The Agency invites the public and Indigenous groups to review the summary of the initial project description and provide feedback related to the proposed ...
1 alternate format found
French HTML
  • Relevance: 245.56
  • Avis public Projet de piste de l'aéroport de Waterloo — Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 19 mars 2021 — L'Agence d'évaluation d'impact du Canada (l'Agence) a accepté une description initiale du projet pour le projet de piste de l'aéroport de Waterloo, situé à Breslau, en Ontario. L'Agence invite le public et les groupes autochtones à examiner le résumé de la description initiale du projet et à formuler des ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Waterloo Airport Runway Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Updated: 2021-03-19
  • Document: 138384E.pdf
  • Relevance: 296.56
  • Waterloo Airport Runway Project Runway 14-32 Extension Initial Project Description English Summary Following the Requirements of the Impact Assessment Act Waterloo Region International Airport March 9, 2021 MTE File No.: 44941-100 MTE Consultants | 44941-100 | Waterloo Region Airport (YKF) Runway Extension – Summary (English) | March 9, 2021 1 Part A: General Information The Regional Municipality of Waterloo (Region) is planning the Runway 14-32 Extension Project ...
1 alternate format found
French PDF
  • Relevance: 245.56
  • À l’aéroport international de la région de Waterloo Prolongement de la piste 14-32 Description initiale du Projet Résumé en Français Conformément aux exigences de la Loi sur l’analyse d’impact À l’aéroport international de la région de Waterloo 9 mars, 2021 MTE File No.: 44941-100 Consultants MTE | 44941-100 | Prolongement de piste de l'aéroport de Waterloo (YKF) - Résumé - Français | 9 mars 2021 1 Partie A : Informations générales La municipalité ...
Date modified: