9A-2-20-8 Installation of a Pipeline

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project 9A-2-20-8 Installation of a Pipeline
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-01-25
  • Document: 142657E.html
  • Relevance: 323.45
  • Notice of Determination January 25, 2022 – Canadian Forces Base Suffield The Department of National Defence has determined that the proposed ‘9A-2-20-8 Installation of a Pipeline' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measure The Department of National Defence is satisfied that that the carrying out of the project is not ...
1 alternate format found
French HTML
  • Relevance: 272.45
  • Avis de détermination Le 25 janvier 2022 – Base des Forces canadiennes Suffield Le Ministère de la Défense nationale a déterminé que le projet proposé ‘9A-2-20-8 Installation d'un pipeline' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense nationale est convaincu que le projet est peu ...

Document Public Comment Period on Intent to Make a Determination

  • Project 9A-2-20-8 Installation of a Pipeline
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-04-28
  • Document: 138818E.html
  • Relevance: 301.24
  • Public Comment Period on Intent to Make a Determination 9A-2-20-8 Installation of a Pipeline April 28, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals ...
1 alternate format found
French HTML
  • Relevance: 250.24
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination 9A-2-20-8 Installation d'un pipeline Le 28 avril 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette détermination. Tous les commentaires reçus seront ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: