Document Notice of Determination

  • Project Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2021-08-03
  • Document: 140912E.html
  • Relevance: 307.19
  • Notice of Determination August  3, 2021 – 4 Wing Cold Lake The Department of National Defence has determined that the proposed ‘Building Demolition and Underground Fuel Line Removal' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not ...
1 alternate format found
French HTML
  • Relevance: 256.19
  • Avis de détermination Le 3 août 2021 – 4e Escadre Cold Lake Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Démolition d'un bâtiment et enlèvement d'une conduite de carburant souterraine' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale est ...

Document Public Comment Period on Intent to Make a Determination

  • Project Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-06-08
  • Document: 139316E.html
  • Relevance: 302.76
  • Public Comment Period on Intent to Make a Determination Building Demolition and Underground Fuel Line Removal – 4 Wing Cold Lake June 8, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. ...
1 alternate format found
French HTML
  • Relevance: 251.76
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Démolition d'un bâtiment et enlèvement d'une conduite de carburant souterraine - 4e Escadre Cold Lake Le 8 juin 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...