Document Notice of Determination
- Project Construction and Operation of Building A-320, at CFB Borden
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2021-09-02
- Document: 141191E.html
- Relevance: 309.02
- Notice of Determination September 2, 2021 – Canadian Forces Base (CFB) Borden The Department of National Defence has determined that the proposed "Construction and Operation of Building A-320, at CFB Borden" project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · impacts on rights of Indigenous peoples; · comments received from the public; and · technically and economically feasible ...
1 alternate format found
French HTML
- Relevance: 258.02
- Avis de détermination Le 2 septembre 2021 – Base des Forces canadiennes (BFC) Borden Le Ministère de la Défense nationale a déterminé que le projet proposé «Construction et opération d'un immeuble A-320» n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : ·répercussions sur les droits des peuples autochtones; ·commentaires reçus du public; et · les mesures d'atténuation qui sont réalisables ...