Construction and Operation of Building A-320, at CFB Borden

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construction and Operation of Building A-320, at CFB Borden
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2021-09-02
  • Document: 141191E.html
  • Relevance: 309.02
  • Notice of Determination September 2, 2021 – Canadian Forces Base (CFB) Borden The Department of National Defence has determined that the proposed "Construction and Operation of Building A-320, at CFB Borden" project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · impacts on rights of Indigenous peoples; · comments received from the public; and · technically and economically feasible ...
1 alternate format found
French HTML
  • Relevance: 258.02
  • Avis de détermination Le 2 septembre 2021 – Base des Forces canadiennes (BFC) Borden Le Ministère de la Défense nationale a déterminé que le projet proposé «Construction et opération d'un immeuble A-320» n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : ·répercussions sur les droits des peuples autochtones; ·commentaires reçus du public; et · les mesures d'atténuation qui sont réalisables ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construction and Operation of Building A-320, at CFB Borden
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-07-21
  • Document: 140722E.html
  • Relevance: 305.58
  • Public Comment Period on Intent to Make a Determination Construction and Operation of Building A-320, at CFB Borden July 21 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more ...
1 alternate format found
French HTML
  • Relevance: 254.58
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction et opération d'un immeuble A-320 à la BFC Borden Le 21 juillet 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette détermination. Tous ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: