Installation of three oil wells and associated pipelines- Canadian Forces Base (CFB) Suffield

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Installation of three oil wells and associated pipelines- Canadian Forces Base (CFB) Suffield
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2021-10-18
  • Document: 141607E.html
  • Relevance: 315.11
  • Notice of Determination October  18, 2021 – Canadian Forces Base (CFB) Suffield The Department of National Defence has determined that the proposed ‘Installation of three oil wells and associated pipelines' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factor: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying ...
1 alternate format found
French HTML
  • Relevance: 264.11
  • Avis de détermination Le 18 octobre 2021 – Base des forces canadiennes (BFC) Suffield Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Construction de 3 puits de pétrole et d'oléoducs' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · Les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense nationale est convaincu que le ...

Document Public Comment Period on Intent to Make a Determination

  • Project Installation of three oil wells and associated pipelines- Canadian Forces Base (CFB) Suffield
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-09-16
  • Document: 141340E.html
  • Relevance: 312.47
  • Public Comment Period on Intent to Make a Determination Installation of three oil wells and associated pipelines– Canadian Forces Base (CFB) Suffield September 16, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received ...
1 alternate format found
French HTML
  • Relevance: 261.47
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction de 3 puits de pétrole et d'oléoducs – Base des Forces canadiennes (BFC) Suffield Le 16  septembre 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: