Infrastructure extension - Mgezo Street

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Intent to Make a Determination-Start of Public Comment Period

  • Project Infrastructure extension - Mgezo Street
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-02-24
  • Document: 142316E.html
  • Relevance: 325.99
  • Public Notice Infrastructure extension - Mgezo Street – Public Comments Invited Décember 03, 2021 – Indigenous Services Canada must determine whether the proposed Infrastructure extension – Mgezo Street, located in Odanak is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted ...
1 alternate format found
French HTML
  • Relevance: 274.99
  • Avis public Prolongement d'infrastructures – rue Mgezo – Période de consultation publique 03 décembre 2021 – Services aux Autochtones Canada doit déterminer si le projet proposé Prolongement d'infrastructures – rue Mgezo, situé à Odanak est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, Services aux Autochtones Canada invite le public à formuler des commentaires sur cette détermination. Tous les ...

Document Notice of Determination

  • Project Infrastructure extension - Mgezo Street
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-02-18
  • Document: 142924E.html
  • Relevance: 325.47
  • Notice of Determination Quebec – February 18, 2022 – Indigenous Services Canada has determined that the proposed Infrastructure extension – Mgezo Street is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Technically and economically feasible mitigation measures. Mitigation measures taken into account for this determination are: ensure that construction site vehicles are in good working order to ...
1 alternate format found
French HTML
  • Relevance: 274.47
  • Avis de décision Québec – 18 février 2022 – Services aux Autochtones Canada a déterminé que le projet Prolongement d'infrastructures – rue Mgezo n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Cette détermination reposait sur les facteurs suivants : mesures d'atténuation réalisables sur les plans technique et économique. Les mesures d'atténuation prises en compte pour cette détermination sont les suivantes : s'assurer que les véhicules de ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: