Spanish Mountain Gold Project

Registry Search Mobile

Registry Search

Skip to Filters

53 results

Document Notice of Time Limit Suspension with Reasons

  • Project Spanish Mountain Gold Project
  • Document Category: Additional Information
  • Reference Number: 29
  • Document Date: 2024-07-31
  • Document: 158412E.html
  • Relevance: 338.18
  • July 31, 2024: The Impact Assessment Agency of Canada is re-posting this Notice of Time Limit Suspension with Reasons in accordance with the Notice of Transition. Notice of Time Limit Suspension with Reasons Ottawa — July 31, 2024 — On August 10, 2022, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for Spanish Mountain Gold Ltd.'s (the Proponent) Spanish Mountain Gold Project. The Agency has taken ...
1 alternate format found
French HTML
  • Relevance: 287.18
  • Le 31 juillet 2024 : L'Agence d'évaluation d'impact du Canada réaffiche cet avis de suspension du délai avec motifs conformément à l'avis de transition. Avis de suspension du délai avec motifs Ottawa — le 31 juillet 2024 — Le 10 août 2022, l'Agence d'évaluation d'impact du Canada (l'AEIC) a suspendu le délai de 180 jours prévu pour l'étape préparatoire, en vertu de la Loi sur l'évaluation d'impact, pour le projet aurifère Spanish Mountain de Spanish Mountain Gold Ltd. (le ...

Document Notice of Transition to the Amended Impact Assessment Act

  • Project Spanish Mountain Gold Project
  • Document Category: Additional Information
  • Reference Number: 31
  • Document Date: 2024-07-31
  • Document: 158315E.html
  • Relevance: 338.18
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa — July 31, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a step ...
1 alternate format found
French HTML
  • Relevance: 287.18
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée   Ottawa — Le 31 juillet 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou ...

Document Joint Summary of Issues and Engagement

  • Project Spanish Mountain Gold Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Document Date: 2022-06-23
  • Document: 144181E.pdf
  • Relevance: 277.26
  • :@BHEHB @LC ?SIML ;DFHML ;VFHML CS :@BHEHOSD DR CS ?SIML :9 3MU 1,*. DQR 7@QRHLFQ 1=) ...
1 alternate format found
French PDF
  • Relevance: 226.26
  • Pacific and Yukon Region Région du Pacifique et du Yukon C. P. 9426 Station Prov Govt 757 West Hastings Street 757 rue Hastings Ouest Victoria CB V8W 9V1 Suite 201A bureau 210 A Vancouver BC V6C 3M2 Vancouver (C-B) V6C 3M2 UNCLASSIFIED - NON CLASSIFIÉ 23 juin 2022 Envoi par courriel Doug Ramsey Directeur, Durabilité et Affaires autochtones Spanish Mountain Gold Ltd. Doug.Ramsey@spanishmountaingold.com Numéro de dossier de l’Agence : 005827 Numéro de dossier du ...

Document Public Notice - Participant Funding Available

  • Project Spanish Mountain Gold Project
  • Document Category: For Public Participation
  • Reference Number: 5
  • Document Date: 2022-04-27
  • Document: 143679E.html
  • Relevance: 273.45
  • Public Notice Spanish Mountain Gold Project Participant Funding Available April 27, 2022 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the impact assessment process for the proposed Spanish Mountain Gold Project, an open-pit gold mine located in the Cariboo region of central British Columbia, approximately 70 kilometres northeast of Williams Lake. Funding is available for eligible ...
1 alternate format found
French HTML
  • Relevance: 222.45
  • Avis public Projet aurifère Spanish Mountain Disponibilité d'une aide financière aux participants Le 27 avril 2022 — Une aide financière fournie par l'Agence d'évaluation d'impact du Canada (l'Agence) est mise à la disposition du public et des groupes autochtones pour favoriser leur participation au processus d'évaluation d'impact du projet aurifère Spanish Mountain, une mine d'or à ciel ouvert située dans la région de Cariboo, au centre de la Colombie-Britannique, à environ 70 ...

Document Public Notice - Public Comments Invited on a Summary of the Initial Project Description

  • Project Spanish Mountain Gold Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Document Date: 2022-04-25
  • Document: 143651E.html
  • Relevance: 273.32
  • Public Notice Spanish Mountain Gold Project Public Comment Period and Virtual Information Sessions Spanish Mountain Gold Ltd. is proposing an open-pit gold mine located in the Cariboo region of central British Columbia, approximately 70 kilometres northeast of Williams Lake. Comments Invited The project is subject to a federal impact assessment process under the Impact Assessment Act and a provincial environmental assessment under British Columbia's Environmental Assessment Act. The ...
1 alternate format found
French HTML
  • Relevance: 222.32
  • Avis public Projet aurifère Spanish Mountain Période de consultation publique et séances d'information virtuelles Spanish Mountain Gold Ltd. propose le projet aurifère Spanish Mountain, une mine d'or à ciel ouvert située dans la région de Cariboo, au centre de la Colombie-Britannique, à environ 70 kilomètres au nord-est de Williams Lake. Consultation publique Le projet est assujetti à un processus d'évaluation d'impact fédéral en vertu de la Loi sur l'évaluation d'impact et à une ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Spanish Mountain Gold Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2022-03-15
  • Document: 143286E.pdf
  • Relevance: 270.65
  • Spanish Mountain Gold Project – Initial Project Description i of xxxii March 15, 2022 INITIAL PROJECT DESCRIPTION SUMMARY This document is an Initial Project Description (IPD) for the proposed Spanish Mountain Gold Project (the Project), which is being developed by Spanish Mountain Gold Ltd. (SMG). The Project description is based on a Pre-Feasibility Study completed by SMG in 2021 that envisions an open pit gold mine with an estimated production of approximately 96 million tonnes ...
1 alternate format found
French PDF
  • Relevance: 219.65
  • Projet Aurifère Spanish Mountain - Résumé De La Description Initiale Du Projet 1 of 25 March 17, 2022 1.0 PROJET AURIFÈRE SPANISH MOUNTAIN 1.1 RÉSUMÉ DE LA DESCRIPTION INITIALE DU PROJET Le présent document est une Description initiale du projet (DIP) proposée pour le projet aurifère Spanish Mountain (le Projet), en cours de développement par Spanish Mountain Gold Ltd. (SMG). La description du Projet est basée sur une étude de préfaisabilité réalisée par SMG en ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: