Document Notice of Determination

  • Project Seaspan Deltaport - Tug Basin Pile Reconfiguration
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-05-13
  • Document: 143924E.html
  • Relevance: 332.9
  • Notice of Determination  Delta, B.C. –May 13, 2022– The Vancouver Fraser Port Authority has determined that the proposed Seaspan Deltaport - Tug Basin Pile Reconfiguration located at the southeast side of Roberts Bank causeway of Roberts Bank Terminal is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors:  Impacts on rights of Indigenous peoples   Indigenous knowledge  Community knowledge  Comments ...
1 alternate format found
French HTML
  • Relevance: 281.9
  • Avis de détermination  Delta, C.-B. – Le 13 mai 2022 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de reconfiguration des pieux du bassin de remorqueurs de Seaspan Deltaport, situé du côté sud-est de la digue Roberts Bank du terminal Roberts Bank, n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement.  Cette détermination a été obtenue en considérant les facteurs suivants :  Effets sur les droits des peuples ...

Document Seaspan Deltaport - Tug Basin Pile Reconfiguration

  • Project Seaspan Deltaport - Tug Basin Pile Reconfiguration
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-04-08
  • Document: 143571E.html
  • Relevance: 329.8
  • Public notice  Seaspan Deltaport - Tug Basin Pile Reconfiguration – Public comments invited  April 8, 2022 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Seaspan Deltaport - Tug Basin Pile Reconfiguration, located on the Southeast side of Roberts Bank Causeway of Roberts Bank Terminal, is likely to cause significant adverse environmental effects. Written comments to be received by May 7, 2022.  To help ...
1 alternate format found
French HTML
  • Relevance: 278.8
  • Avis public  Seaspan Deltaport - Reconfiguration des pieux du bassin de remorqueurs – Le public est invité à formuler des commentaires.  Le 8 avril 2022 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la proposition de reconfiguration des pieux du bassin de remorqueurs de Seaspan Deltaport, situé du côté sud-est de la digue Roberts Bank du terminal Roberts Bank (C.-B.), est susceptible ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: