Document Notice of Determination
- Project Construction of Distribution Powerline to IPC Canada 8-27-19-8-4
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2022-10-25
- Document: 145359E.html
- Relevance: 337.7
- Notice of Determination October 25, 2022 – Canadian Forces Base (CFB) Suffield The Department of National Defence has determined that the proposed ‘Construction of Distribution Powerline to IPC Canada 8-27-19-8-4' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: comments received from the public; and technically and economically feasible mitigation measures The Department of National ...
1 alternate format found
French HTML
- Relevance: 286.7
- Avis de détermination Le 25 octobre 2022 – Base des Forces canadiennes (BFC) Suffield Le Ministère de la Défense nationale à déterminé que le projet proposé ‘Construction d'une ligne électrique de distribution vers IPC Canada 8-27-19-8-4' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : commentaires reçus du public; et les mesures d'atténuation réalisables, sur les plans technique et ...