Document Notice of Determination for Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
- Project Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
- Document Category: Additional Information
- Reference Number: 3
- Updated: 2022-12-08
- Document: 145725E.html
- Relevance: 370.56
- Notice of Determination for Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond December 8, 2022 - Indigenous Services Canada has determined that the proposed Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond is not likely to cause significant adverse environmental effects. The determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples -Indigenous ...
1 alternate format found
French HTML
- Relevance: 319.56
- Avis de détermination pour la Première nation de Thunderchild - Étang de déchets de procédé de la station de traitement d'eau 115C du site de Turtle Lake Le 8 décembre 2022 - Services aux Autochtones Canada a déterminé que le projet de bassin de résidus de traitement de la Première nation de Thunderchild - site 115C de Turtle Lake n'est pas susceptible d'entraîner des effets ...