Construction of an industrial building at the YMX International Aerocity of Mirabel - Public Comments Invited

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construction of an industrial building at the YMX International Aerocity of Mirabel - Public Comments Invited
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-03-07
  • Document: 146864E.html
  • Relevance: 358.66
  • Notice of Determination Mirabel, Quebec – March 7, 2023 – The Business Development Bank of Canada (BDC) has determined that the proposed construction of an industrial building of SEC YMX 1 is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically ...
1 alternate format found
French HTML
  • Relevance: 307.66
  • Avis de décision Mirabel, Québec – 7 mars 2023 – La Banque de Développement du Canada (BDC) a déterminé que le projet de construction d'un bâtiment industriel de SEC YMX 1 n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Cette détermination reposait sur les facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et mesures d'atténuation ...

Document Notice of Intent to Make a Determination - Start of Public Comment Period

  • Project Construction of an industrial building at the YMX International Aerocity of Mirabel - Public Comments Invited
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-02-01
  • Document: 146409E.html
  • Relevance: 355.37
  • Public Notice Construction of an industrial building at the YMX International Aerocity of Mirabel – Public Comments Invited February 1, 2023 – The Business Development Bank of Canada (BDC) must determine whether the proposed construction of an industrial building of SEC YMX1, located at the Mirabel airport, Qc, is likely to cause significant adverse environmental effects. To help inform this determination, BDC is inviting comments from the public respecting that determination. All ...
1 alternate format found
French HTML
  • Relevance: 304.37
  • Avis public Construction d'un bâtiment industriel à YMX Aérocité internationale de Mirabel – Période de consultation publique Le 1er février 2023 – La Banque de développement du Canada (BDC) doit déterminer si le projet proposé de construction d'un bâtiment industriel de SEC YMX1, lequel sera situé à l'aéroport de Mirabel, Qc, est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, BDC invite le public à ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: