Aspen Power Station Project

Registry Search Mobile

Registry Search

Skip to Filters

50 results

Document Notice of Impact Assessment Decision with Reasons

  • Project Aspen Power Station Project
  • Document Category: Additional Information
  • Reference Number: 26
  • Updated: 2023-09-28
  • Document: 153100E.html
  • Relevance: 371.82
  • Notice of Impact Assessment Decision with Reasons Ottawa — September 28, 2023 —The Impact Assessment Agency of Canada (the Agency) decided that an impact assessment is not required for the Aspen Power Station Project (the project) located in Saskatchewan, proposed by Saskatchewan Power Corporation (the proponent). In accordance with subsection 16(2) of the Impact Assessment Act (IAA), the Agency has considered the following factors: the Detailed Project Description, and the response to ...
1 alternate format found
French HTML
  • Relevance: 320.82
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — 28 septembre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de centrale électrique d'Aspen (le projet) situé en Saskatchewan, proposé par Saskatchewan Power Corporation (le promoteur). Conformément au paragraphe 16 (2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a pris en compte les éléments suivants : la description ...

Document Notice of Time Limit Resumption

  • Project Aspen Power Station Project
  • Document Category: Additional Information
  • Reference Number: 22
  • Updated: 2023-09-15
  • Document: 157881E.html
  • Relevance: 370.51
  • Notice of Time Limit Resumption Ottawa — September 15, 2023 — On August 31, 2023, Saskatchewan Power Corporation (the proponent) provided its response to the Summary of Issues and Detailed Project Description for the Aspen Power Station Project to the Impact Assessment Agency of Canada (the Agency). On September 12, 2023, the Agency accepted these documents as it determined that they contained the information prescribed by the Information and Management of Time Limits Regulations. The ...
1 alternate format found
French HTML
  • Relevance: 319.51
  • Avis de reprise du délai Ottawa — le 15 septembre 2023 — Le 31 août 2023, Saskatchewan Power Corporation (le promoteur) a fourni sa réponse au sommaire des questions (en anglais seulement) et une description de projet détaillée (en anglais seulement) pour le projet de centrale électrique d'Aspen à l'Agence d'évaluation d'impact du Canada (l'Agence). Le 12 septembre 2023, l'Agence a accepté ces documents, car elle a déterminé qu'ils contenaient les renseignements prescrits par le Règlement sur ...

Document Supporting geospatial data - Detailed Project Description

  • Project Aspen Power Station Project
  • Document Category: Geospatial data files
  • Reference Number: 24
  • Updated: 2023-09-08
  • Document: 153096E.html
  • Relevance: 369.8
  • Supporting geospatial data – Detailed Project Description SaskPower has provided electronic geospatial data files on September 8, 2023, related to the Aspen Generating Station Project. The dataset contains the following 12 layers for maps provided in the Detailed Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada. Layer Name Projection (name) Page number PROJECT PHYSICAL WORKS FOLDER     EASEMENT NAD83(CSRS) / UTM ...
1 alternate format found
French HTML
  • Relevance: 318.8
  • Données géospatiales connexes – description détaillée du projet (anglais seulement) Saskatchewan Power Corporation a fourni des fichiers électroniques de données géospatiales le 8 septembre 2023, liées au projet de centrale électrique d'Aspen. L'ensemble de données contient 12 de couches pour les cartes fournies dans la description détaillée du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada. Layer ...

Document Summary of the Detailed Project Description

  • Project Aspen Power Station Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Updated: 2023-09-01
  • Document: 153099E.pdf
  • Relevance: 369.1
  • Aspen Power Station Detailed Project Description Summary Submitted to: The Impact Assessment Agency Submitted by: Saskatchewan Power Corporation (SaskPower) September 2023 Aspen Power Station Detailed Project Description Summary i Table of Contents ABBREVIATIONS .................................................................................................................... IV PART A: GENERAL INFORMATION ...
1 alternate format found
French PDF
  • Relevance: 318.1
  • Centrale électrique d’Aspen Résumé de la description détaillée du projet Soumis à : Agence d’évaluation d’impact du Canada Soumis par : Saskatchewan Power Corporation (SaskPower) Septembre 2023 i Centrale électrique d’Aspen Résumé de la description détaillée du projet Table des matières ABRÉVIATIONS................................................................................................................................................ IV PARTIE A : RENSEIGNEMENTS ...

Document Notice of Time Limit Suspension with Reasons

  • Project Aspen Power Station Project
  • Document Category: Additional Information
  • Reference Number: 18
  • Updated: 2023-06-29
  • Document: 152216E.html
  • Relevance: 362.73
  • Notice of Time Limit Suspension with Reasons Ottawa — June 30, 2023 — On June 27, 2023, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the Planning Phase under the Impact Assessment Act for the Aspen Power Station Project (the project) proposed by Saskatchewan Power Corporation (the proponent). The Agency has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have ...
1 alternate format found
French HTML
  • Relevance: 311.73
  • Avis de suspension du délai avec motifs Ottawa — 30 juin 2023 — Le 27 juin 2023, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet de centrale électrique d'Aspen (le projet), proposé par Saskatchewan Power Corporation (le promoteur). L'Agence a pris cette mesure à la suite d'une demande écrite du promoteur (anglais seulement) de suspendre le délai afin d'avoir ...

Document Summary of Issues

  • Project Aspen Power Station Project
  • Document Category: Additional Information
  • Reference Number: 17
  • Updated: 2023-06-02
  • Document: 151987E.pdf
  • Relevance: 360.08
  • June 2, 2023 – ASPEN POWER STATION PROJECT – SUMMARY OF ISSUES – PAGE 1 OF 4 SUMMARY OF ISSUES – Aspen Power Stafion Project This document provides a high-level summary of issues submifted to the Impact Assessment Agency of Canada (the Agency) about the Aspen Power Stafion Project (the Project) during the comment period on the Summary of the Inifial Project Descripfion, submifted by Saskatchewan Power Corporafion (the Proponent). The issues highlight informafion that support ...
1 alternate format found
French PDF
  • Relevance: 309.08
  • 2 juin 2023 — PROJET DE CENTRALE ÉLECTRIQUE D’ASPEN — RÉSUMÉ DES ENJEUX – PAGE 1 DE 5 SOMMAIRE DES QUESTIONS – Projet de centrale électrique d’Aspen Le présent document fournit un sommaire général des quesfions présentées à l’Agence d’évaluafion d’impact du Canada (l’Agence) à propos du projet de centrale électrique d’Aspen (le projet) pendant la période de commentaires sur la descripfion inifiale du projet, présenté par la Saskatchewan Power Corporafion (le promoteur). Les ...

Document Public Notice - Participant Funding Available

  • Project Aspen Power Station Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Updated: 2023-04-27
  • Document: 147453E.html
  • Relevance: 356.58
  • Public Notice Aspen Power Station Project Participant Funding Available April 27, 2023 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the impact assessment process for the proposed Aspen Power Station Project, a new combined-cycle natural gas power plant located near Lanigan, Saskatchewan. Funding is available for eligible individuals and groups to assist their participation in the ...
1 alternate format found
French HTML
  • Relevance: 305.58
  • Avis public Projet de centrale électrique d'Aspen Disponibilité d'une aide financière aux participants Le 27 avril 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition du public et des groupes autochtones une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet de centrale électrique d'Aspen, une centrale à cycle combiné au gaz naturel, située près de Lanigan, en Saskatchewan. Cette aide financière est mise à la ...

Document Public Notice: Comments Invited on the Summary of the Initial Project Description

  • Project Aspen Power Station Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Updated: 2023-04-25
  • Document: 147389E.html
  • Relevance: 356.39
  • Public Notice Aspen Power Station Project Comments Invited on the Summary of the Initial Project Description What is happening? April 25, 2023 — Saskatchewan Power Corporation (the proponent) is proposing the Aspen Power Station Project, a new combined-cycle natural gas power plant located near Lanigan, Saskatchewan. The Impact Assessment Agency of Canada (the Agency) invites the public and Indigenous Peoples to review the summary of the Initial Project Description and provide ...
1 alternate format found
French HTML
  • Relevance: 305.39
  • Avis public Projet de centrale électrique d'Aspen Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 25 avril 2023 — La Saskatchewan Power Corporation (le promoteur) propose le projet de centrale électrique d'Aspen, une centrale à cycle combiné au gaz naturel, située près de Lanigan, en Saskatchewan. L'Agence d'évaluation d'impact du Canada (l'Agence) invite le public et les peuples autochtones à examiner le résumé de la ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Date modified: