Hardrock Gold Mine Project

Comment Search Mobile

Comment Search

Skip to filters

7 results

Attachment Draft Decision Statement and Draft Analysis Report dated June 18, 2024.

  • Hardrock Gold Mine Project
  • Author: Administrator on behalf of Ginoogaming First Nation
  • Reference Number: 62
  • Submitted: 2024-07-12 - 2:44 PM
  • Project Phase: N/A
  • Participation Notice: N/A
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment Included
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Greenstone Gold Mines c/o Stephen Lines, Manager, Environmental Assessment and Permitting 2381 Bristol Circle, Suite B203 Oakville, Ontario L6H 5S9 for the Hardrock Gold Mine Project Description of the Designated Project Greenstone Gold Mines is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and on-site metal mill located approximately five kilometres south of Geraldton, Ontario, at the intersection of Highway 11 (Trans-Canada Highway) and Michael Power Boulevard. As proposed, the gold mine would have an ore production capacity of 30,000 tonnes per day, and the metal mill would have an ore input capacity of 30,000 tonnes per day. Conduct of the environmental assessment The Canadian Environmental Assessment Agency (the Agency) conducted an environmental assessment of the Designated Project in ...
  • Attachment Included
  • 1 Impact Assessment Agency of Canada DRAFT ANALYSIS OF GREENSTONE GOLD MINES ’ PROPOSED CHANGES TO THE HARDROCK GOLD MINE PROJECT (TEMPORARY WATER BY- PASS CHANNEL) JUNE 2024 2 Table of Contents 1. Introduction ......................................................................................................................................... 3 2. Context ............................................................................................................................................... 3 3. Project Change ................................................................................................................................... 4 4. Analysis under the Physical Activities Regulations ............................................................................ 4 5. Assessment of potential adverse environmental effects .................................................................... 5 5.1 Fish and ...
  • Attachment Included
  • Uncontrolled when Printed HP-GGM-EV-119-1014_0 Page 1 of 18 Greenstone Mine Proposed Project Change HP-GGM-EV-119-1014_0 November 28, 2023 Date Rev Status Prepared By Checked By Approved By 11/28/2023 0 Final Signature: Name: Stantec Stantec / Greenstone Mine Kendra Button Greenstone Mine <Signature removed> Uncontrolled when Printed HP-GGM-EV-119-1014_0 Page 2 of 18 Table of Contents 1 Introduction ........................................................................................................................ 4 2 EIS/EA Conditions ................................................................................................................ 7 3 Description of the Proposed Change ................................................................................... 7 4 Consultation and Engagement ............................................................................................ 8 5 ...
  • Attachment Included
  • Strategic Policy and Programs Politiques et programmes stratégiques 160 Elgin St., 22nd floor 160 rue Elgin, 22e étage Ottawa, ON K1A 0H3 Ottawa (Ontario) K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic June 18, 2024 Sent by email Chief Sheri Taylor Ginoogaming First Nation P.O. Box 89 Longlac, ON, P0T 2A0 sheri.taylor@ginoogamingfn.ca Dear Chief Sheri Taylor: Subject: Advance invitation to comment on proposed changes to the Hardrock Gold Mine Project and Decision Statement On November 28th, 2023, Greenstone Gold Mines (the Proponent) informed the Impact Assessment Agency of Canada (the Agency) of their proposed changes to the Hardrock Gold Mine Project (the Project) as per condition 2.14 of the Decision Statement (issued on December 10, 2012 and amended on February 10, 2021). The Agency invites your comments on the proposed changes to the Project and the Decision Statement by July 10, 2024. ...

Report

Date Submitted Display Filters

Filters

Consultation TypesDisplay Filters

Comment TagsDisplay Filters

Participation NoticesDisplay Filters

Date modified: