Boat Harbour Remedation Project EIS - ECCC Technical Review
- Reference Number
- 27
- Text
ECCC has undertaken its Technical Review of the EIS submitted for the Boat Harbour Remedation Project. Please find our comments attached.
- Submitted by
- Administrator on behalf of Environment and Climate Change Canada (ECCC)
- Phase
- N/A
- Public Notice
- N/A
- Attachment(s)
-
- Bank Swallow_Residence_GoC_2019.pdf (134.6 KB)
- Boat Harbour EIS Review Cover Letter.pdf (295.4 KB)
- ECCC Boat Harbour Technical Review Annex 1-3.pdf (1.3 MB)
- GuidelinesForEffectiveWildlifeResponsePlans_DRAFT_2020-02-28.pdf (619.5 KB)
- GuidelinesForTheCaptureTransportCleaningAndRehabilitationOfOiledWildlife-DRAFT_2020-02-17.pdf (740.7 KB)
- Operational Framework for Use of Conservation Allowances_2012.pdf (311.5 KB)
- PRISM ACSS guidelines May 5 2014.pdf (4.5 MB)
- TechnicalGuidanceAndProtocolsForMigratoryBirdSurveys-DRAFT-2020-03-13.pdf (2.3 MB)
- Date Submitted
- 2021-01-13