Boat Harbour Remedation Project EIS - ECCC Technical Review

Reference Number
27
Text

ECCC has undertaken its Technical Review of the EIS submitted for the Boat Harbour Remedation Project.  Please find our comments attached.

Submitted by
Administrator on behalf of Environment and Climate Change Canada (ECCC)
Phase
N/A
Public Notice
N/A
Attachment(s)
  • Bank Swallow_Residence_GoC_2019.pdf (134.6 KB)
  • Boat Harbour EIS Review Cover Letter.pdf (295.4 KB)
  • ECCC Boat Harbour Technical Review Annex 1-3.pdf (1.3 MB)
  • GuidelinesForEffectiveWildlifeResponsePlans_DRAFT_2020-02-28.pdf (619.5 KB)
  • GuidelinesForTheCaptureTransportCleaningAndRehabilitationOfOiledWildlife-DRAFT_2020-02-17.pdf (740.7 KB)
  • Operational Framework for Use of Conservation Allowances_2012.pdf (311.5 KB)
  • PRISM ACSS guidelines May 5 2014.pdf (4.5 MB)
  • TechnicalGuidanceAndProtocolsForMigratoryBirdSurveys-DRAFT-2020-03-13.pdf (2.3 MB)
  • Date Submitted
    2021-01-13
    Date modified: