Boat Harbour Remedation Project EIS - ECCC Technical Review

Reference Number
27
Text

ECCC has undertaken its Technical Review of the EIS submitted for the Boat Harbour Remedation Project.  Please find our comments attached.

Submitted by
Administrator on behalf of Environment and Climate Change Canada (ECCC)
Phase
N/A
Public Notice
N/A
Attachment(s)
  • Bank Swallow_Residence_GoC_2019.pdf (137849 KB)
  • Boat Harbour EIS Review Cover Letter.pdf (302522 KB)
  • ECCC Boat Harbour Technical Review Annex 1-3.pdf (1289463 KB)
  • GuidelinesForEffectiveWildlifeResponsePlans_DRAFT_2020-02-28.pdf (634399 KB)
  • GuidelinesForTheCaptureTransportCleaningAndRehabilitationOfOiledWildlife-DRAFT_2020-02-17.pdf (758485 KB)
  • Operational Framework for Use of Conservation Allowances_2012.pdf (319018 KB)
  • PRISM ACSS guidelines May 5 2014.pdf (4638366 KB)
  • TechnicalGuidanceAndProtocolsForMigratoryBirdSurveys-DRAFT-2020-03-13.pdf (2389428 KB)
  • Date Submitted
    2021-01-13
    Date modified: