Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Construction of a new solid waste transfer station (SWTS). The new transfer station has been design for 25 years period, the initial construction contract will accommodate waste projections for the first 15 years. The solid waste will be hauled 222 kilometers to the La Ronge SW landfill. The SWTS is constructed on a new site location ~ 13 kilometers from the community on provincial land. The new site is ~ 2 kilometers from the existing landfill. The new SWTS includes grade separated roll off bins for waste disposal. There will be a site operator trailer provided at the location and recycle (metals) bins also. The existing landfill will be closed but a full closure of the existing landfill is not in the project scope currently. The construction contract will include shaping the existing solid waste into a mound and covering with 300mm of sand. The landfill can be capped and final closure to occur in the future. The project will supply a roll off trunk/trailer (to haul to La Ronge) and also a garbage collection truck for collection in the community. Finally a garage will be built in the community to park the two new trucks inside.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of determination for the Peter Ballantyne Southend Solid Waste Transfer Station | - | January 18, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | December 7, 2020 |
Contacts
ISC-SKENVIndigenous Services Canada
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-780-5392
Email: aadnc.isc-skenv.aandc@canada.ca
-
Location
- SE 1/4 36-10-84 W2M (Saskatchewan)
-
Nature of Activity
- Waste Management
-
Assessment Status
Completed -
Start Date
2020-12-07 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81206
Nearby assessments
...within 200 kilometres-
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lynn Lake Gold Project
-
Key Lake Extension Project
Key Lake -
Wheeler River Project
Russell Lake -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Highway 914 - All Weather Roadway - McArthur River Mine Site to Cigar Lake Mine Site
Waterbury Lake -
Millennium Mine Project
Moon Lake -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Lynn Lake Gold Project
Lynn Lake -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon