Quinte Conservation Staff Comments

Reference Number
15
Text

Quinte Conservation staff have reviewed the project proposal. The following items should be addressed:

  • The potential for water temperature changes for the receiving waterbody during initial pumping of the mine. The effect of potential water temperature changes on existing biota.
  • The water quality of the mine in comparison to the water quality of the receiving waterbody.
  • The timing of the initial pumping both from a water quantity and quality perspective.
  • Potential Erosion/geomorphology effects on receiving waterbody.
  • The potential for disturbance to watercourses and wetlands (temporary and permanent) for the installation of roads, transmission lines and pumping infrastructure.
Submitted by
Quinte Conservation
Phase
Planning
Public Notice
Public Notice - Public Comments Invited on a Summary of the Initial Project Description
Attachment(s)
N/A
Date Submitted
2023-06-12 - 10:40 AM