Marmora Clean Energy Hub Project
Quinte Conservation Staff Comments
- Reference Number
- 15
- Text
Quinte Conservation staff have reviewed the project proposal. The following items should be addressed:
- The potential for water temperature changes for the receiving waterbody during initial pumping of the mine. The effect of potential water temperature changes on existing biota.
- The water quality of the mine in comparison to the water quality of the receiving waterbody.
- The timing of the initial pumping both from a water quantity and quality perspective.
- Potential Erosion/geomorphology effects on receiving waterbody.
- The potential for disturbance to watercourses and wetlands (temporary and permanent) for the installation of roads, transmission lines and pumping infrastructure.
- Submitted by
- Quinte Conservation
- Phase
- Planning
- Public Notice
- Public Notice - Public Comments Invited on a Summary of the Initial Project Description
- Attachment(s)
- N/A
- Date Submitted
- 2023-06-12 - 10:40 AM