Pigeon River Drilled Well Groundwater Supply

Design and construct for (2) new 15,000 litre potable water tanks (to be installed underground) for purposes of supplying potable water to the facility. Provide new waterproof tub and isolated lid, as well as new culvert complete with hinged and locking cover. Connect potable water piping complete with insulation, heat trace, isolation valving and check valves though tub wall and route piping through trench to existing water treatment building in close proximity.  Excavation required to native subgrade, and backfill using excavated fill and clear stone as  required to provide 3:1 grading to native sub-grade, finished with topsoil and sod. Project also includes re-configuring the existing cistern for firefighting water use.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

The assessment is in progress.

Participate

Contacts

CBSA Environmental Operations
Canada Border Services Agency
Hayley Buchanan, Manager of Compliance
355 North River Road
Tower B, Floor 19
Ottawa, Ontario K1A 0L8
Telephone: 343-291-5284
Email: Hayley.Buchanan@cbsa-asfc.gc.ca


Date modified: