New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
New (Single) Tower Construction
Sapotaweyak Cree Nation is proposing the construction of a 33.5 meter telecommunication tower to provide high-speed internet access to the Sapotaweyak Cree Nation. Antennas will be mounted at the top of the tower. The antennas will operate in the 5 and 60 to 68 GHz frequency bands. All of the equipment necessary to operate this facility will be housed in a small equipment cabinet located on site. This tower may undergo future modifications or the addition/replacement of antennas.
Upgrade (Single) Tower
Sapotaweyak Cree Nation is proposing the addition of a 0.2 meter antennas, in the 5 and 60 to 68 GHz frequency bands, mounted at the top of an existing 61 meter tower which is located on Sapotaweyak Cree Nation. The antenna will be installed to improve network access to high-speed internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced.
New Fibre Installation
Sapotaweyak Cree Nation plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Sapotaweyak Cree Nation. The project involves the installation of approximately 57 km of underground fiber optic cable from the 1st E Street and Manitoba's Provincial Highway 10 in Mafeking, Manitoba, along to the new tower at Shoal River 65B Reserve.
The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | December 11, 2023 |
1 | Public Notice - New (Single) Tower Construction, Upgrade (Single) Tower, New Fibre Installation | - | November 1, 2023 |
Contacts
Innovation Science Economic Development CanadaNathalie Martel, Program Officer, Connected Canada Branch
C.D. Howe Building
235 Queen Street
Ottawa, Ontario K1A 0H5
Email: Get-connected-branchez-vous@ised-isde.gc.ca
-
Location
- Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B (Manitoba)
- Sapotaweyak Cree Nation, Shoal River 65A, Shoal River 65B (Manitoba)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2023-11-01 -
Proponent
Sapotaweyak Cree Nation -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
86058
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Launch Ramp Reconstruction - Whitefish Point, MB - Fall 2021
Whitefish Point Harbour -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Mosahiken Cree Nation - Road Upgrades - 2324
Mosahiken -
Launch Ramp Replacement - Moose Lake, Manitoba
Moose Lake, Manitoba -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth River Dike Extension
Red Earth IR 29A -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Tower Hill VHF Tower
Riding Mountain National Park