Tahltan Lake Dam Repairs

Proposed Facility Upgrade Works

The project scope includes the replacement of the existing weir and walkway with a new dam and fishway. The new dam will be constructed of aluminum or steel bin-wall structures which will be filled with bulk fill, and the fishway will be aluminum. An advantage to constructing the dam out of bin walls is that walls can be removed and recycled in response to local environment changes. The new aluminum fishway will be stable and corrosion resistant. 

The current condition of the existing weir and walkway structure cannot be repaired to extend its service life because the current design is not amenable to the operational and maintenance (O&M) that would bring it to an acceptable and dependable design standard. Due to the remote location of this site; routine O&M is not an obtainable nor practical part of life cycle management. The proposed new structure would have minimal O&M investment requirements. Alternative building materials such as wood and steel would require extensive corrosion and O&M investments.

Tahltan Lake supports significant sockeye lakeshore spawning, is culturally significant to the Tahltan Nation, and is an important location for DFO Stock Assessment. The project will support government-wide and Fisheries & Oceans objectives by showing the public and First Nation partners that there is a commitment to continue the work that the camp has been doing into the long-term future.

More


Latest update

September 17, 2025 – The Department of Fisheries and Oceans issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

 

.

Participate

Key documents

Key documents
Document number Document title File Date
2 Notice of Determination - September 17, 2025
1 Notice of Intent - Start of Public comment Period DOCX (16 KB) September 25, 2024

Contacts

Fisheries and Oceans Canada
Richard Chan, Project Engineer
200-401 Burrard Street
Vancouver, British Columbia V6C 3S4
Telephone: 604-666-4656
Email: Richard.Chan@dfo-mpo.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Tahltan Lake (British Columbia)
  • Nature of Activity

    • Dams and reservoirs
  • Assessment Status

    Completed
  • Start Date

    2024-09-25
  • Proponent

    Fisheries and Oceans Canada, Real Property, Safety and Security, Technical Support, Pacific Region
  • Authorities

    • Fisheries and Oceans Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    88938
Date modified: