Josephine Cone Mine Project
Please note that the Josephine Cone Mine Project was terminated at the request of the proponent, and was then restarted under a new name, Bending Lake Iron Project (80181).
The proposed project consists of the construction, operation, decommissioning and abandonment of an open-pit iron ore mine with an ore production capacity of 56 000 tonnes per day and a metal mill with an ore input capacity of 56 000 tonnes per day (the Project), located approximately 49 kilometres southwest of Ignace, Ontario.
Please note that the proponent was formerly known as Bending Lake Iron Group.
Latest update
Participate
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
-
Location
- Ignace (Ontario)
-
Nature of Activity
- Mines and Minerals
-
Assessment Status
Terminated -
Proponent
Ambershaw Metallics Inc. -
Authorities
- Canadian Environmental Assessment Agency
- Fisheries and Oceans Canada
- Transport Canada
-
Assessment Type
Comprehensive study under CEAA 1992 -
Reference Number
66282
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Bending Lake Iron Project
49 kilometres southwest of Ignace -
Goliath Gold Project
Dryden -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Hudson Tower -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #1 -
Lac Seul First Nation Broadband Upgrade
Lac Seul First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #2 -
Frenchman's Head Sewage Treatment Plant and Collection System (Lac Seul)
Frenchman's Head (Lac Seul) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Whitefish Tower -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Kejick Bay North Tower -
Hammond Reef Gold Project
Mitta Lake -
LSFN Burial Site Mapping
Lac Seul First Nation -
Abandoned Fuel Tank Decommissioning
Seine River First Nation -
Seine River First Nation Standpipe Replacement
Seine River First Nation -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
New Fibre Installation
Project site 18 (Wabauskang No. 21) -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
New Fibre Installation
Project site 15 (Gakijiwanong Anishinaabe Nation) -
Lac La Croix First Nation Former School Area Remediation
Lac La Croix First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Griffith Iron Ore Redevelopment Project
Ear Falls -
Rainy River Project
Township of Chapple -
Ojibway Nation of Saugeen Fibre Construction
Ojibway Nation of Saugeen -
Caribou Street Culvert Replacement
Rainy River First Nation -
Big Grassy First Nation Cultural Space Building
Morson -
Lac Des Mille Lac First Nation Residential Sub Division
Lac Des Mille Lac First Nation -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Rehabilitation of the Whitefish Bay Water Distribution System
Project Area -
Range and Training Area - Thunder Bay Region
Upsala -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Trans-Canada Highway Twinning Project
Kenora -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
New Fibre Installation / Upgrade Multiple Towers
North Spirit Lake PoP -
Slate Falls Nation - Lot Servicing for future houses
Slate Falls Nation -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Peguis First Nation Landfill Expansion
Peguis First Nation -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN