Electrical Line for IPC Canada: site 2-32-19-8-4 and 2-33-19-8-4 - Canadian Forces Base (CFB) Suffield

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Electrical Line for IPC Canada: site 2-32-19-8-4 and 2-33-19-8-4 - Canadian Forces Base (CFB) Suffield
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-11-07
  • Document: 145476E.html
  • Relevance: 349.23
  • Notice of Determination November 7, 2022 – Canadian Forces Base (CFB) Suffield The Department of National Defence has determined that the proposed ‘Electrical Line for IPC Canada: site 2-32-19-8-4 and 2-33-19-8-4' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; ...
1 alternate format found
French HTML
  • Relevance: 298.23
  • Avis de détermination Le 7 novembre 2022 – Base des Forces canadiennes (BFC) Suffield Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Ligne électrique pour IPC Canada: site 2-32-19-8-4 et 2-33-19-8-4' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances ...

Document Public Comment Period on Intent to Make a Determination

  • Project Electrical Line for IPC Canada: site 2-32-19-8-4 and 2-33-19-8-4 - Canadian Forces Base (CFB) Suffield
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-05-11
  • Document: 143791E.html
  • Relevance: 332.73
  • Public Comment Period on Intent to Make a Determination Electrical Line for IPC Canada: site 2-32-19-8-4 and 2-33-19-8-4 – Canadian Forces Base (CFB) Suffield May 11, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments ...
1 alternate format found
French HTML
  • Relevance: 281.73
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Ligne électrique pour IPC Canada: site 2-32-19-8-4 et 2-33-19-8-4 – Base des Forces canadiennes (BFC) Suffield Le 11 mai 2022 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: