Arnaud Mining Project
Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project.
Mine Arnaud Inc. is proposing the construction, operation and decommissioning of an approximately 1.2 million tonnes a year apatite concentrate mine with an operating life of 31 years. The proposed project includes an open-pit mine, an ore processing plant, and overburden, waste rock and tailings containment and storage areas, including a cell for waste titaniferous magnetite, a by-product of the ore processing. The project will also involve moving an approximately 8 km section of railway track at the mine site and building and using storage, handling and loading facilities at the Port of Sept-Îles.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
External Links
Please note that access to external websites is provided solely as a courtesy. Users should be aware that the information offered by non‑Government of Canada websites that are not subject to the Official Languages Act might be available in only one language.
- Documentation sur le site Web du promoteur (French Only)
Contacts
Fisheries Protection ProgramFisheries and Oceans Canada
Telephone: 1-877-722-4828
Email: habitat-qc@dfo-mpo.gc.ca
-
Location
- Sept-Îles (Quebec)
-
Nature of Activity
- Mines and Minerals
-
Assessment Status
Completed -
Start Date
2012-01-11 -
Proponent
Mine Arnaud Inc. -
Authorities
- Canadian Environmental Assessment Agency
- Canadian Transportation Agency
- Fisheries and Oceans Canada
-
Assessment Type
Comprehensive study under CEAA 1992 -
Reference Number
63926
Nearby assessments
...within 200 kilometres-
Renovation of the Mgr-Blanche terminal at the Port of Sept-Iles
Port of Sept-Iles -
BA042154 Heating system conversion - Buildings B300/B301
HMCS Jolliet, in the city of Sept-Îles -
Pointe-aux-Basques wharf modernization project at the Port of Sept-Îles
Pointe-aux-Basques -
Construction of 200 housing units and supporting infrastructures.
Uashat -
Construction of a warehouse for the temporary storage of refractory bricks
Port of Sept-Iles -
Kami Iron Ore Project
Pointe-Noire -
Expansion of an iron ore storage area and extension of the railway
Port of Sept-Îles -
Runoff management system optimization project at Pointe-Noire facilities
Pointe-Noire -
Sept-Îles Airport - Remplacement of a reservoir
Sept-Îles Airport -
Enclosure Drainage at Sept-Iles Airport
Sept-Iles Airport -
Installation of a concrete slab and a new 25,000 L reservoir at Sept-Îles airport
Sept-Îles -
Ecocentre development in Uashat Mak Mani-Utenam
Uashat Mak Mani-Utenam -
Côte-Nord Mining Railway Project
Sept-Îles to Emeril Junction (Labrador) -
Glamping Mani-Utenam
Mani-Utenam -
Construction of 200 housing units and supporting infrastructures.
Mani-Utenam -
Decontamination and deconstruction of buildings and installations - Ile du Corossol
Corossol Island -
Construction of the necessary infrastructure and production of spirulina
Mani-Utenam -
Mani-Utenam drinking water plant upgrade
Mani-Utenam -
[Residential Development and Storm Outfall Construction, Mani-Utenam]
Mani-Utenam (Malioténam) -
[Residential Development and Storm Outfall Construction, Mani-Utenam]
Mani-Utenam (Malioténam) -
North Shore Extension / Saguenay - Sept-Iles Natural Gas Pipeline
Sept-Îles -
Equipment shelter replacement
Moisie -
Rehabilitation of the lighthouse of l'île aux Oeufs
Île-aux-Oeufs -
Maintenance Dredging at Rivière-au-Tonnerre Fishing Harbour
Rivière-au-Tonnerre Fishing Harbour -
Development of 11 lots and housing construction, F street, Ekuanitshit
Ekuanitshit -
Manitou and C Street Extensions and D Easement
Ekuanitshit -
Relocation of the Domestic Outfall of the Mingan Wastewater Treatment Plant
Ekuanitshit -
Stabilization and Protection of the Mingan River Bank
Ekuanitshit -
Development of new campsites and outhouses on La Grande-île
Mingan Archipelago National Park Reserve of Canada -
Construction of a base camp for group activities at the Barachois campground in Montpetit
Mingan Archipelago National Park Reserve -
Development of new campsites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve
Mingan Archipelago National Park Reserve -
Installation of a 15,000L diesel fuel tank at the Rivière-au-Renard Search and Rescue station.
Rivière-au-Renard Search and Rescue station -
Construction of an additional campsite at Le Havre au Sauvage
Mingan Archipelago National Park Reserve