Frontier Oil Sands Mine Project
The Frontier Oil Sands Mine Project, proposed by Teck Resources Limited includes the construction, operation and reclamation of an oil sands surface mine with a production capacity of about 260,000 barrels per day of bitumen. The project is located in northeastern Alberta, approximately 110 kilometres north of Fort McMurray. The project is a truck and shovel mine which includes two open pits, an ore preparation plant, a bitumen processing plant, tailings preparation and management facilities, cogeneration facilities, support utilities, disposal and storage areas, river water intake, a fish habitat compensation lake, bridge, roads, airfield and camp. The estimated project area is over 24,000 hectares. If the project is approved, the proposed project would operate for 41 years.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1162 | Notice of Termination | - | February 25, 2020 |
1161 | From Teck Resources Limited to the Minister of Environment and Climate Change Canada re: Notice of Withdrawal of the Frontier Oil Sands Project Application Canadian Environmental Assessment Registry No. 65505 | PDF (74 KB) | February 25, 2020 |
715 | Errata pertaining to the Report of the Joint Review Panel, Teck Resources Limited, Frontier Oil Sands Mine Project | PDF (44 KB) | October 8, 2019 |
711 | Report of the Joint Review Panel, Teck Resources Limited Frontier Oil Sands Mine Project | PDF (9.1 MB) | July 25, 2019 |
3 | Notice of Commencement of an Environmental Assessment | - | January 19, 2012 |
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
-
Location
- Fort McKay (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
Terminated -
Proponent
Teck Resources Limited -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Environmental assessment by Review Panel under CEAA 2012 -
Reference Number
65505
Nearby assessments
...within 200 kilometres-
Pierre River Mine Project
Fort McKay -
Jackpine Mine Expansion Project
Fort McKay -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Patterson Lake South Mine Project
Patterson Lake -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Rook 1 Project
Patterson Lake -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
Fox Lake School
Fox Lake