Suncor Energy Coke Fired Boiler Replacement Project
Suncor Energy Inc. is proposing the construction and operation of two new natural gas fired cogeneration units capable of producing 700 megawatts of power located at the Suncor Base Plant, approximately 25 kilometres north of Fort McMurray, Alberta. Once the natural gas fired cogeneration units are operational, the three existing coke-fired boilers within the Base Plant footprint would be decommissioned. Project components would include two cogeneration units for steam/electrical production and supporting structures including a pump house, an electrical building, a new 260 kilovolts substation within plant facilities, a natural gas supply pipeline, and two new transmission lines to export electricity from the plant.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
-
Location
- 25 kilometres north of Fort McMurray (Alberta)
-
Nature of Activity
- Hydroelectric Energy
-
Assessment Status
Completed -
Proponent
Suncor Energy Inc. -
Authorities
- Canadian Environmental Assessment Agency
-
Assessment Type
Assessment not applicable -
Reference Number
80144
Nearby assessments
...within 200 kilometres-
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Jackpine Mine Expansion Project
Fort McKay -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Pierre River Mine Project
Fort McKay -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Frontier Oil Sands Mine Project
Fort McKay -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
Patterson Lake South Mine Project
Patterson Lake -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Rook 1 Project
Patterson Lake -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
North Corridor Expansion Project
Peerless Lake -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation