Big Bear Camp Aerodrome Project
Big Bear Contracting Ltd. is proposing to construct and operate a new aerodrome near the south shore of Grygar Lake, about 145 kilometres north of La Loche, Saskatchewan. As proposed, the Big Bear Camp Aerodrome Project would include a 1,524 metre-long airplane runway, a taxiway, an aircraft parking area and a terminal building. The project would span about 23 hectares of land.
Latest update
August 29, 2024 — The Impact Assessment Agency of Canada issued the Summary of Issues to the proponent on August 22, 2024, for the preparation of the Response to the Summary of Issues.
At a glance
Planning
Planning
In progress
34/180 days
Key documents
- Summary of Issues August 22, 2024
- Initial Project Description of a designated project June 25, 2024
- Summary of the Initial Project Description of a designated project June 25, 2024
Comment periods
- Public Notice - Public comments invited on the Summary of the Initial Project Description July 23, 2024 to August 12, 2024 - Closed
Post Decision
Post Decision phase is an ongoing process
If approved, the project may proceed to construction as federal authorizations and permits are issued, and as conditions and other requirements are met.
Post Decision
Not started
Participate
Contacts
Big Bear Camp Aerodrome ProjectImpact Assessment Agency of Canada
9700 Jasper Avenue, Suite 1145
Edmonton, Alberta T5J 4C3
Telephone: 780-495-2037
Email: BigBear@iaac-aeic.gc.ca
Media Relations
Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-549-3870
Email: media@iaac-aeic.gc.ca
-
Location
- Grygar Lake (Saskatchewan)
-
Nature of Activity
- Airport and Airfields
-
Assessment Status
In progress -
Start Date
2024-07-23 -
Proponent
Big Bear Contracting Ltd. -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Planning Phase for Impact Assessment -
Reference Number
88735
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Patterson Lake South Mine Project
Patterson Lake -
Rook I Project
Patterson Lake -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
Jackpine Mine Expansion Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Frontier Oil Sands Mine Project
Fort McKay -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park