Bigstone Cree Nation High School Waterline Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Bigstone Cree Nation plans to install a water pipeline to the high school to increase water conveyance capacity. The proposed project will involve installation of a new 250 mm water pipeline that is 950 m in length via horizontal directional drilling. The new water pipeline will be connected to the existing 150 mm pipeline at the school site to form a loop that can increase the reliability of water distribution.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
.
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Bigstone High School Waterline Project | - | August 11, 2022 |
1 | Bigstone Cree Nation High School Waterline: Public Comment Period on Intent to Make a Determination | - | May 27, 2022 |
List all records
Contacts
Cassandra BretonIndigenous Services Canada
Cassandra Breton, Environment Officer
630 Canada Place 9700 Jasper Ave, Edmonton AB
Edmonton, Alberta T5J 4G2
Telephone: 587-338-7033
Email: cassandra.breton@sac-isc.gc.ca
-
Location
- Wabasca (Alberta)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2022-05-27 -
Proponent
Bigstone Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83671
Nearby assessments
..within 200 kilometres-
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Sawridge Band Solar Farm Project
Sawridge Band -
North Corridor Expansion Project
Peerless Lake -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
North Corridor Expansion Project
Highway 88 -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Woodland Cree CMHC Co-Investment Housing Project - Marten Lake Subdivision (10-Units)
Cadotte Lake -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
OS-7239 Woodland Cree 226
OS-7239 -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Woodland Cree 226
OS-7238 -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Woodland Cree CMHC Co-Investment Housing Project - Simon Lake Subdivision (21-Units)
Woodland Cree First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Jackpine Lake