Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The large lake to the west will be temporarily held back with a dam, road area will be de-watered with a screened intake hose and fish salvage will occur. Road will be excavated (approximately 35 ft across and 80 ft wide, old culvert will be removed and new installed. Road bed fill repacked, compaction tests, graveled and riprap placed on either ditch to prevent erosion and sediment entering the water.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | August 26, 2021 |
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 22 June to 22 July, 2020 | - | June 25, 2020 |
Contacts
Wood Buffalo National Park149 McDougal Rd
Box 750
Fort Smith, Northwest Territories X0E 0P0
Telephone: 867-872-7960
Email: rescon-ftsmith@pc.gc.ca
-
Location
- Wood Buffalo National Park (Alberta)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2020-06-22 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80805
Nearby assessments
...within 200 kilometres-
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
Smith's Landing First Nation Residential Housing Development Project
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
Clairière de plantes baccifères au terrain de camping du lac Pine, parc national du Canada Wood Buffalo
Wood Buffalo National Park -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Wood Buffalo National Park Highway Asphalt Surface Treatment
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Sandhills Substation Generator Upgrade
Wood Buffalo National Park of Canada -
Sass River / Prebble Creek Embankment Repair and Gabion Installation by the Government of the Northwest Territories
Wood Buffalo National Park of Canada -
Former Gunnar Mine Site Rehabilitation Project
Gunnar