Wood Buffalo National Park Highway Asphalt Surface Treatment
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Roadway rehabilitation and improvement on highway 5 through Wood Buffalo National Park from km 169.6 to 210.9 including chip sealing, slope stability improvement and use of the existing aggregate pits within the park.
Latest update
March 26, 2021 – The public comment period on the project is closed. Parks Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada - Public comments invited from February 24 to March 26, 2021 | - | February 24, 2021 |
Contacts
Wood Buffalo National Park149 McDougal Rd
Box 750
Fort Smith, Northwest Territories X0E 0P0
Telephone: 867-872-7960
Email: rescon-ftsmith@pc.gc.ca
-
Location
- Wood Buffalo National Park (Northwest Territories)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2021-02-24 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81398
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Sandhills Substation Generator Upgrade
Wood Buffalo National Park of Canada -
Sass River / Prebble Creek Embankment Repair and Gabion Installation by the Government of the Northwest Territories
Wood Buffalo National Park of Canada -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Smith's Landing First Nation Phase 1A Housing Development (Part 2)
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
Berry Plant Clearing in Pine Lake Campground, Wood Buffalo National Park
Wood Buffalo National Park -
New Fibre Installation
Project site 1: Thabacha Náre 196A & Thebathi 196 -
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Little Red River Cree Nation: Fox Lake New School
Fox Lake