Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Wood River Controls Inc. is proposing the installation of a new point-to-point link (10.7 - 11.7 GHz band) from Dorintosh, SK to Waterhen Lake, SK. The station located in Waterhen Lake is located on Waterhen No. 130 I.R. The project will encompass installation of a 1.8m (6 ft) antenna 20 m high onto an existing SaskTel tower.
Latest update
2024-01-09– Innovation, Science and Economic Development Canada has issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
.
Participate
Contacts
STS-Western RegionInnovation, Science and Economic Development Canada / Government of Canada
Aaron Yaskowich, Spectrum Management Officer
123 2nd Avenue South, 7th floor
Saskatoon, Saskatchewan S7K 7E6
Telephone: 306-501-1356 or 1-866-694-8389
Email: ic.spectrumsaskatoon-saskatoonspectre.ic@canada.ca
-
Location
- Waterhen 130 Reserve (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2023-11-24 -
Proponent
Wood River Controls Inc. -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
86112
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Flying Dust Commercial Project
Meadow Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Dore Lake Wharf Removal
Dore Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Powwow Arbour Construction
Pierceland -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
Ministikwan Subdivision Development
Ministikwan IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Crean Channel Modification
Prince Albert National Park -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
SaskPower Transformer Salvage
Prince Albert National Park -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park