Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

107836 results

Project Dredging at the Commercial Port of Cap-aux-Meules, Îles-de-la-Madeleine

  • Location (Port of Cap-aux-Meules, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88669
  • Last Modified: 2024-07-27
  • Relevance: 414.95
  • Context In fall 2024 and 2025, Transport Canada (TC) will continue the dredging work begun in 2020 at Cap-aux-Meules harbour. An environmental impact assessment (EIA) was carried out in 2020 for this project, and covered the dredging of approximately 55,000 m3 (68,700 m2) of sediment in place to reach depths of -7.1 m in the harbour and -6.5 m in the access channel. Subsequently, three addendums to the EEE were issued for the following activities: 2021-2022: continuation of the 2020 ...

Project Port Maitland Dock and Launch Ramp Repair

  • Location (Port Maitland Small Craft Harbour, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88673
  • Last Modified: 2024-07-27
  • Relevance: 414.95
  • The Haldimand County are proposing a dock and boat launch ramp repair project at the Port Maitland Small Craft Harbour. The proposed work includes concrete repairs to a dock cap and walkway, steel rail and bump rail improvements, and addition of various dock components. The work will also include replacement of two modular concrete panels on the boat launch ramp below the high water mark. New pre-cast panels will be used to replace the existing panels.  

Project Jasper House Bungalows Master Plan

  • Location (Jasper National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88674
  • Last Modified: 2024-07-27
  • Relevance: 414.95
  • Parks Canada has received a 20-year Master Plan for the redevelopment of Jasper House Bungalows, located approximately 3km south of the Jasper townsite in Jasper National Park. Jasper House Bungalows is currently open seasonally from May to October but will begin year-round operations as part of the master plan. The proposed redevelopment includes increases to staff and guest accommodation, demolition and rebuild of aging infrastructure including cabins and lodge buildings, reconfiguration of ...

Project Purchase of zero-emission vehicles and charging infrastructure to enhance the transit system in Horse Lake First Nation

  • Location (Hythe, AB, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88678
  • Last Modified: 2024-07-27
  • Relevance: 414.95
  • The proposed project intends to replace the existing fleet of three school buses and mini buses with electric ones, and pave an existing 3 km road so that the purchased vehicles may access it.  The Project is led by the Horse Lake First Nation and is located on their reserve lands near Hythe, Alberta. Project works include: Purchase of six electric vehicles Purchase and installation of six charging stations Installation of ~3 km of asphalt on existing road surfaces. The ...

Project Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project

  • Location (Last Mountain Lake National Wildlife Area, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88755
  • Last Modified: 2024-07-26
  • Relevance: 414.92
  • Environment and Climate Change Canada and Transport Canada must determine whether the proposed re-naturalization of waterbodies through removal of water control infrastructure within Last Mountain Lake National Wildlife Area,  Saskatchewan, is likely to cause significant adverse environmental effects. To help inform this determination, Environment and Climate Change Canada and Transport Canada are inviting comments from the public respecting that determination. All comments received will ...

Project BC Aviation Museum Project Description

  • Location (Victoria International Airport (YYJ) - Sidney BC, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88767
  • Last Modified: 2024-07-26
  • Relevance: 414.91
  • Project Type: Upgrade of access road to museum Proponents: BC Aviation Museum Authority: Victoria Airport Authority (VAA) Location: Victoria International Airport (YYJ) – Sidney BC Schedule: July 2024 to August 2024 The project involves upgrades to the gravel access road from Taxiway Sierra to the BC Aviation Museum. Construction activities will generally occur during normal business hours and will include the construction of a 10m wide access road with 4" of topsoil ...

Project Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport

  • Location (Edmonton International Airport, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88766
  • Last Modified: 2024-07-26
  • Relevance: 414.91
  • July 26, 2024 –Edmonton Regional Airports Authority must decide whether the proposed Reservoir 1 Gravel Road Construction and Parking Lot Regrading Project located at the Edmonton International Airport is likely to cause significant adverse environmental effects. To help inform this decision, Edmonton Regional Airports Authority is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public [and may be ...

Project Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta

  • Location (Cenovus Foster Creek - North Trunk Gate (NTG), Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88764
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Cenovus Energy Inc. is proposing building a new structure of 35-meters radiocommunication tower located at Foster Creek - Cold Lake AB – 14-8-71-4-W4, an undeveloped site in Cold Lake. The project will install antennas at 27-meters to  provide two radiocommunication link from the proposed tower to an existing tower. HP2-18 High Performance Parabolic Reflector Antenna; 0.6 m ; Polarization: Horizontal ; Operating Frequency Band: 17.7 - 19.7 GHz will be used. One link carries ...

Project Cenovus Foster Creek - Maintenance in Cold Lake Alberta.

  • Location (Cenovus Foster Creek - Maintenance, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88762
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Cenovus Energy Inc. is proposing modification of 30.5-meters radiocommunication tower located at Cold Lake AB - Maintenance Bldg Cenovus FC, a developed site in Cold Lake. The project will install antennas at 27-meters to  provide two radiocommunication link from the proposed tower to an existing tower. HP2-18 High Performance Parabolic Reflector Antenna; 0.6 m ; Polarization: Horizontal ; Operating Frequency Band: 17.7 - 19.7 GHz will be used. One link carries SCADA traffic and ...

Project Comfort Cove Floating Dock Installation

  • Location (Comfort Cove SCH is located within the community of Comfort Cove, NL. The project site is accessible via Poplar Ave off of Route 343., Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88763
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • DFO, Small Craft Harbour intends to install a new floating dock onto an existing system of floating docks at the Small Craft Harbours site in Comfort Cove. The floating dock will be anchored in place using concrete anchor blocks.

Project Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range

  • Location (Cenovus Energy SCADA system modification Project, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88761
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Cenovus Energy is proposing the installation of 22 new 30-feet radiocommunication towers on skids to be located at Foster Creek, AB - developed sites in the Cold Lake Air Weapons Range. The project will add only new Remote Terminal Units at drilled well sites in the Foster Creek area on small CSA approved skids. Each new skid will be a non-permanent structure consisting of a directional Yagi antenna, 30 feet (9m) in height and a radio. The system will operate in the UHF band for well site data ...

Project Murray River Coal Project

  • Location (Tumbler Ridge, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80041
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • HD Mining International Ltd. proposes the construction, operation and decommissioning of an underground coal mine and supporting infrastructure, including a 5.8 kilometre rail load-out. The proposed project is located 12.5 kilometres southwest of Tumbler Ridge, British Columbia and would produce six million tonnes of metallurgical coal per year for an estimated mine life of 25 years.

Project Marathon Palladium Project

  • Location (Marathon, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: Completed
  • Reference Number: 54755
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 kilometres from Marathon, Ontario. The proposed project would include three open pits, an ore processing plant, tailings and mine rock storage facilities, site access roads, a transmission line, explosives factory and magazines, water management facilities, ancillary mine infrastructure and associated activities. The rate of production would be approximately 25,000 tonnes of ore ...

Project Woodfibre LNG Project

  • Location (Howe Sound, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: Completed
  • Reference Number: 80060
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Woodfibre LNG Limited Partnership is proposing to construct and operate a liquefied natural gas (LNG) facility located seven kilometres southwest of Squamish, British Columbia, on the northwestern shoreline of Howe Sound. The proposed project includes the development of a natural gas liquefaction facility and an LNG transfer facility to enable the export of the LNG product to global markets via marine vessels. It is expected to operate for at least 25 years and to produce between 1.5 ...

Project Magino Gold Project

  • Location (Wawa, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80044
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Alamos Gold Inc. is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and metal mill located 14 kilometres south-east of Dubreuilville, Ontario. Mining would occur over 10 years with an ore production capacity of 45 200 tonnes per day. The on-site metal mill would have an ore input capacity of 35 000 tonnes per day and would operate for approximately 12 to 15 years.   Please note that the proponent was ...

Project James Bay Lithium Mine Project

  • Location (100 kilometres east of James Bay, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80141
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Galaxy Lithium (Canada) Inc. is proposing the construction, operation and decommissioning of an open-pit lithium mine located approximately 100 kilometres east of James Bay and the Eastmain Cree Community, in Quebec. As proposed, the James Bay Lithium Mine Project would have an estimated mine life of 15 to 20 years, and produce on average 5,480 tonnes of ore per day. The project would include an open-pit mine and concentrator facility, tailings, waste rock, ore and ...

Project Lynn Lake Gold Project

  • Location (Lynn Lake, Manitoba)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80140
  • Last Modified: 2024-07-26
  • Relevance: 414.89
  • Alamos Gold Inc. is proposing the construction, operation, decommissioning, and reclamation of an open pit gold mine and new metal mill located approximately 1000 kilometres north of Winnipeg, near Lynn Lake, Manitoba. The Lynn Lake Gold Project would involve the redevelopment of two historical gold mines (the Gordon site and MacLellan site) and have an ore input capacity of 8,000 tonnes per day over an 13-year period. Components of the project would include new mine infrastructure, ...

Project Reconstruction of runway 09-27 and rehabilitation of traffic lanes A, B, C, D and apron at Sept-Îles Airport

  • Location (Sept-Îles Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88599
  • Last Modified: 2024-07-26
  • Relevance: 414.88
  • The main runway 09-27, taxiways A, B, C, D and the apron at Sept-Îles airport have exceeded their useful life and are showing signs of deterioration that could jeopardize their safe operation. Various geotechnical studies have also shown that the existing soil-cement mix has exceeded its service life, and that its structural function is almost non-existent. As a result of these findings, and to ensure that the movement area remains safe and compliant, the reconstruction of the runway ...

Project Pugwash Yacht Club Dredging and Waterlot Extension

  • Location (Pugwash, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 82977
  • Last Modified: 2024-07-26
  • Relevance: 414.88
  • East Side Dredge an area, up to 1708 m2 , between an existing floating wharf and the shoreline at the Pugwash Yacht Club in Pugwash, NS (45.846944, -63.663611) using a long stick excavator operating above the ordinary high water mark. Dredge cut depths will range from 0 m to 2.0 m.  Dredged material will be disposed of in a newly constructed containment cell on site. Install a temporary access road adjacent to the dredge area, perpendicular to the existing service area, which will ...

Project Berth repairs for dolphins and caissons - PCT

  • Location (Berth repairs for dolphins and caissons - PCT, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88677
  • Last Modified: 2024-07-26
  • Relevance: 414.84
  • Berth repairs for dolphins and caissons - PCT Public comments invited  June 27, 2024 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Berth repairs for dolphins and caissons - PCT, located at 2300 Columbia St, Port Moody, are likely to cause significant adverse environmental effects. Written comments to be received by July 26, 2024. To help inform this determination and a decision on whether or ...

Project Upgrading petroleum product storage systems at Rapid Lake

  • Location (Upgrading petroleum product storage systems at Rapid Lake, Quebec) (Upgrading petroleum product storage systems at Rapid Lake, Quebec) (Upgrading petroleum product storage systems at Rapid Lake, Quebec) (Upgrading petroleum product storage systems at Rapid Lake, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88672
  • Last Modified: 2024-07-26
  • Relevance: 414.84
  • The project involves bringing into compliance 4 tanks subject to the Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulation, located in the Algonquin community of Barriere Lake, Rapid Lake. The tanks involved are the underground tank at the elementary school and gymnasium, as well as the above-ground tank at a teachers' residence and a heavy equipment dispensing station. Each of these storage systems have a volume of 5000L or less, and were installed between ...

Project Demolition of Structures, Minor Construction and Removal of Debris - Long Point National Wildlife Area

  • Location (Long Point National Wildlife Area, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88660
  • Last Modified: 2024-07-26
  • Relevance: 414.84
  • Environment and Climate Change Canada-Canadian Wildlife Service (ECCC-CWS) is proposing to undertake a building construction and demolition project at two separate sites at the Long Point National Wildlife Area (LPNWA): the Squires Ridge site and the Bluff's Point site. The LPNWA is located along the Long Point Peninsula, bordered by the shores of Lake Erie, in Norfolk County, Ontario. LPNWA is federal land administered by ECCC-CWS. All buildings on site are owned by ECCC-CWS and are ...

Project Section 82 - Musqueam Foreshore Restoration 6735 Salish Drive

  • Location (Section 82 - Musqueam Foreshore Restoration 6735 Salish Drive, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88760
  • Last Modified: 2024-07-25
  • Relevance: 414.81
  • The proposed project The Vancouver Fraser Port Authority Engineering and Asset Management Department (the Applicant) proposes to restore the natural foreshore area of Musqueam Indian Reserve 2 (the Project), located on the Fraser River estuary, 6735 Salish Sea Drive in Vancouver. The Project consists of: Restoration of the foreshore area, including the removal of debris and unsuitable rip rap. Reinstatement of the dike erosion protection to modern standards including riparian ...

Project Extension of Amisk Street in Opitciwan

  • Location (Opitciwan, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88634
  • Last Modified: 2024-07-25
  • Relevance: 414.81
  • The project is located in Opitciwan and consists of the extension of Amisk Street, as well as the construction of Mikisiw, Warwick, EO-1, EO-3 and EO-4 Streets to serve 1 backflow station lot and 111 low- and medium-density residential lots. The project will also enable the construction of servitude pipelines. The project is divided into two construction phases. The first phase of construction in 2024 will have a surface area of ±51,000 m2. The second construction phase in 2026 will ...

Project Maintenance Dredge 8081 River Road, Delta

  • Location (Maintenance Dredge 8081 River Road, Delta, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88759
  • Last Modified: 2024-07-25
  • Relevance: 414.8
  • The proposed project Envirochem Service Incorporated (the Applicant) is proposing to complete maintenance dredging at 8081 River Road (the Project) in Delta. The Project consists of maintenance dredging within an identical historical polygon of 2500 cubic meters to a design depth of -6.5 meters chart datum. Dredging to be completed using a clamshell and flat or dump scows which would be towed to Point Grey Environment and Climate Change Canada (ECCC) Disposal at Sea disposal site under ...

Project Management of Zebra Mussels in Clear Lake in Riding Mountain National Park

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87319
  • Last Modified: 2024-07-25
  • Relevance: 414.8
  • Riding Mountain National Park is proposing management actions to respond to the detection of Zebra Mussels (Dreissena polymorpha) in Clear Lake, located within the park boundaries. The management actions that may be implemented include the use of potash molluscicide and physical methods (e.g., benthic mats, manual removal, etc.). Zebra Mussels can impact native species, severely affect and/or alter food webs and ecosystems, damage infrastructure, and affect visitor experience. The proposal will ...

Project Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II

  • Location (Montreal Lake IR 106B, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88643
  • Last Modified: 2024-07-25
  • Relevance: 414.8
  • Montreal Lake Cree Nation is proposing to construct Phase II of a new subdivision development. The project will consist of construction of 102 lots on 30 ha of land. The project includes underground utility installations, site roadways and ditching, and lot grading. The proposed site is located approximately 2 km southeast of the community core area, and borders the existing phase 1 Bittern Lake subdivision.   The existing land use of the proposed subdivision site is classified as ...

Project Black Bear Power Plant Project

  • Location (Swan Hills, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 88747
  • Last Modified: 2024-07-25
  • Relevance: 414.79
  • Kiwetinohk Energy Corp. is proposing to construct and operate a new natural gas-fueled electricity generating facility located about 19 kilometres south of Swan Hills, Alberta. As proposed, the Black Bear Power Plant Project would generate about 460 megawatts of electricity for the province and include carbon dioxide (CO2) capture technology, with captured CO2 being transferred by a pipeline to a carbon storage hub. The project is expected to operate for about 30 years.

Project Dakota Tipi First Nation - New Jordan's Principle Facility

  • Location (Dakota Tipi First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88758
  • Last Modified: 2024-07-25
  • Relevance: 414.79
  •   Construction of a 2220 SM multi use facility located near the existing band office.  Sub-structure: Cast-in-place concrete friction piles with grade beams (refer to Geotechnical Report). - Floor assembly: concrete slab on grade with subgrade preparation per geotechnical report. - Structure: Load bearing wood stud framing - Roof: 75% prefabricated wood truss, 25% vaulted glulam exposed structure - Exterior Envelope: fiber cement siding, standing-seam prefinished steel ...

Project Work on the Beauharnois hovercraft ramp

  • Location (Beauharnois, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88757
  • Last Modified: 2024-07-25
  • Relevance: 414.79
  • The Canadian Coast Guard (hereinafter "CCG") uses a site in Beauharnois for its buoy tending operations. This site is equipped with a hovercraft ramp built in 2017. The existing ramp consists of a flexible concrete mat for the lower part of the ramp and a 200 mm-thick reinforced concrete slab-on-grade for the upper part of the ramp. The length of the articulated concrete mat section is around 30 meters, and that of the slab on grade is also around 30 meters. The width of the ramp is ...

Project Telus Communications Inc., new radiocommunications tower (BC153008) in Bella Bella

  • Location (Telus Communications Inc., (BC153008) in Bella Bella, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 85901
  • Last Modified: 2024-07-25
  • Relevance: 414.79
  • Telus Communications Inc. is proposing to erect a new 38m monopole radiocommunications tower on Heiltsuk First Nations land in the community of Bella Bella, BC.  The purpose of the tower is to provide improved wireless service including voice and data to the community.  The tower will initially house 12 large panel antennas to support a variety of communication technologies in the mobile wireless bands.  The tower may undergo periodic antenna additions, replacements, or other ...

Project FESTI - Aircraft Rescue Fire Fighting Props Control System Replacement

  • Location (FESTI, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88751
  • Last Modified: 2024-07-25
  • Relevance: 414.79
  • The Fire and Emergency Services Training Institute (FESTI) is a training facility located at 2025 Courtney Park Drive East, Mississauga, Ontario and offers Aircraft Rescue Fire Fighting ("ARFF") courses and provides regulatory recertification training using a collection of training props. As per the Canadian Aviation Security Regulations (CARs) 323, the Toronto Pearson Fire and Emergency Services' (TPFES) firefighters and external fire departments are required to perform annual ...

Project Norquay Snowmaking Water Diversion Intake Maintenance

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88708
  • Last Modified: 2024-07-25
  • Relevance: 414.78
  • Mount Norquay Ski Resort is proposing to conduct maintenance on the freshwater withdrawal intake in 40 Mile Creek. Water for snowmaking is currently diverted from the creek through an intake pipe with a screened manifold. Maintenance is required because the intake pipe & screen has been pushed upwards out of alignment due to a high water event. Maintenance activities include off-road access to the intake location, helicopter use to fly in equipment and materials, placement of a coffer dam, ...

Project Louise Creek Bank Stabilization

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88756
  • Last Modified: 2024-07-25
  • Relevance: 414.78
  • This project involves adding riprap rocks to the banks and bed on sections of Louise Creek to stabilize eroding banks that are impacting the integrity of the Lake Louise Drive roadway in Banff National Park. In-stream work is required as part of this project, and it will be assessed using a Basic Impact Assessment.

Project Development of the lunar terrain

  • Location (John H. Chapman Space Centre, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88754
  • Last Modified: 2024-07-25
  • Relevance: 414.78
  • As part of the Lunar Exploration Acceleration Program (LEAP), the Canadian Space Agency (CSA) wishes to develop a lunar site on its property in Longueuil. Indeed, one of the elements of LEAP is to develop, launch and operate a Canadian rover to demonstrate technologies on the Moon. The lunar terrain will allow the practice of maneuvers for this rover.

Project Big Bear Camp Aerodrome Project

  • Location (Grygar Lake, Saskatchewan)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 88735
  • Last Modified: 2024-07-25
  • Relevance: 414.78
  • Big Bear Contracting Ltd. is proposing to construct and operate a new aerodrome near the south shore of Grygar Lake, about 145 kilometres north of La Loche, Saskatchewan. As proposed, the Big Bear Camp Aerodrome Project would include a 1,524 metre-long airplane runway, a taxiway, an aircraft parking area and a terminal building. The project would span about 23 hectares of land.

Project Base-wide Asphalt Paving - 5 Wing Goose Bay

  • Location (5 Wing Goose Bay, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88752
  • Last Modified: 2024-07-25
  • Relevance: 414.77
  • The Department of National Defence (DND) is proposing base-wide asphalt paving at 5 Wing Goose Bay. The proposed project will include repairs and new asphalt pavement of the existing parking lots, roads, and adjustments of the storm drain catch basins where required.

Project YMX International Aerocity of Mirabel - Construction of an industrial building on A-3 Street (Lots 5,839,285 and 4,089,985 ptie) and modification of the de-icing centre infrastructure (Lots 2,455,568 and 1,689,909)

  • Location (YMX International Aerocity of Mirabel, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88465
  • Last Modified: 2024-07-25
  • Relevance: 414.76
  • Syscomax proposes to rehabilitate the existing infrastructure at the de-icing centre and build new glycol recycling facilities at YMX International Aerocity of Mirabel. These facilities will include a new industrial building, a dome housing two tanks with a total capacity of 3,000 m3 and a glycol recycling system located on lot No. 5 839 285 of the cadastre of Quebec, on Service Street A-3 at YMX International Aerocity of Mirabel. The floor area of the future building will be approximately ...

Project Alpine Club of Canada (ACC) Shadow Lake Lodge Grey Water Pipe Replacement and Propane System Replacement

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88670
  • Last Modified: 2024-07-25
  • Relevance: 414.73
  • The Alpine Club of Canada (ACC) proposes to excavate and replace the existing grey water pipe and propane system at Shadow Lake Lodge. Replacement and upgrades will allow these services to be operated and maintained more effectively and meet current code and load requirements. Upgrades and additions include adding clean-out ports, insultation and heat tracing to the grey water pipe, combining the existing two propane systems into one system, and adding propane service to two additional ...

Project Attikamek Trail Bridges - Decking and Railing Replacement

  • Location (Sault Ste. Marie Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88667
  • Last Modified: 2024-07-25
  • Relevance: 414.73
  • The 2.2km Attikamek multi-use recreational trail is location on South St. Mary's Island at the Sault Ste. Marie Canal National Historic Site that has two footbridges (150m and 25m respectively, ~2.5m wide) originally constructed in 1995. Structural inspections (2023) reported that all deck boards are in poor condition and recommended replacement within 1 year. All handrail barriers (top, mid, and bottom kick-rails) should be replaced in less than 2 years. Logistically, it makes sense to ...

Project House Decommissioning 2024

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88668
  • Last Modified: 2024-07-25
  • Relevance: 414.73
  • Nine houses are proposed to be decommissioned in Rouge National Urban Park. Deteriorating buildings and property debris negatively impact the natural environment and pose a serious risk to public safety within Rouge National Urban Park. Demolition of the identified buildings will incorporate wildlife conservation and protection design. This project is to be completed outside of sensitive timing periods for species at risk and other wildlife within and around the houses.

Project Rehabilitation of Batterie St-Charles

  • Location (Fortifications of Québec National Historic Site, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88602
  • Last Modified: 2024-07-24
  • Relevance: 414.69
  • The project primarily consists of carrying out masonry and stabilization work of Batterie St-Charles and certain areas of St-Charles wall and Grande Batterie wall. As part of the project, and in order to complete the rehabilitation work, excavation activities have been planned to clear the portion of the faces that are currently back-filled. The work, scheduled from spring 2025 to late autumn 2026, will ensure the structure's stability and extend its lifespan. 

Project Troilus Mining Project

  • Location (Municipality of Baie-James, Quebec)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 83658
  • Last Modified: 2024-07-24
  • Relevance: 414.68
  • Troilus Gold Corp. is proposing the construction, operation and decommissioning of a new open-pit gold and copper mine located approximately 76 kilometres northwest of the Cree community of Mistissini and approximately 170 kilometres north of Chibougamau, Quebec. As proposed, the Troilus Mining Project would include the mining of two former open pits and two new pits, the reuse of the tailings facility, the development of waste rock and overburden piles, and the construction and operation of a ...

Project Essential Radar Telecom Modernization Toronto Fiber Installation

  • Location (Nav Canada Fibre Location, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88637
  • Last Modified: 2024-07-24
  • Relevance: 414.68
  • NAV CANADA is planning to replace existing degraded copper cables between the Toronto Radar Site and the Runway 23 LOC at the Toronto Pearson International Airport.  The Project will consist of the installation of approximately 1.9 km of new fiber optic cable on the existing airport property from the receiver site on the west side of the West Service Road north of Courtneypark Drive East and terminating at the Runway 23 Localizer east of Dixie Road . 1.9 km of the new cabling will be ...

Project Parking Lot Expansion at Twillingate SCH, NL

  • Location (Twillingate SCH is located within the community of Twillingate, NL. The proposed project site is located on the northeastern side of the property, closest to the entrance. The project site is accessible via Main St. off of Route 340., Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88750
  • Last Modified: 2024-07-24
  • Relevance: 414.65
  • The Twillingate SCH parking lot currently experiences a high volume of traffic which currently poses a safety hazard.  The proposed project will expand the existing parking lot into the nearby waterlot to alleviate the traffic strain. The infill area will be protected using armour stone material to surround the perimeter and will use Class A, B, and C rock. The area of infilling below the High Normal Tide (which includes armour on side slopes) is approximately 6000 cubic meters.

Project Septic System Replacement - 2024

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88662
  • Last Modified: 2024-07-24
  • Relevance: 414.62
  • The purpose of this project is to decommission a failing septic system and install a new septic system on a residential property in Rouge National Urban Park. The project works will include site preparation, excavation, installation of the septic tank, and revegetation. During this work, proper erosion and sediment control practices will be installed as required, equipment will be driven in the area around the excavation, and fill will be stockpiled on site. The new septic system will be in ...

Project Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion

  • Location (Kawacatoose IR 88, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88665
  • Last Modified: 2024-07-24
  • Relevance: 414.62
  • Kawacatoose First Nation is proposing a water treatment plant expansion and upgrade. The existing water treatment plant building will be expanded on the northwest side to house three new filter tanks, the electrical room and generator, and on the northeast side to accommodate a new office, washroom and bottle fill room. A new roof will be built over the existing water treatment plant and planned expansion, and a new overhead door will be installed. Existing pumping equipment will be removed and ...

Project Duncan's First Nation New Subdivision - 22 units

  • Location (Duncan First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88567
  • Last Modified: 2024-07-23
  • Relevance: 414.59
  • Duncan First Nation plans to build a new subdivision for 22 residential housing units. The project will occur within ATS section 16-82-25-W5M. The proposed work will include vegetation clearing and construction of a road surface and 22 bordering subdivision lots. The road surface will be 8 m wide with a 1 m wide ditch, with a total right of way width of 30m. The road will tie-in to Range Road 254 and Township Road 822. PVC sanitary pipe and water main pipe will also be installed. The total ...

Project Loon River First Nation Wastewater Treatment Facility Upgrade and Expansion

  • Location (Loon River First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88565
  • Last Modified: 2024-07-23
  • Relevance: 414.59
  • Loon River First Nation is proposing an upgrade and expansion of their current wastewater system. The project is located within NE-09-87-9-W5M and SE-09-87-9-W5M. The existing lagoon is undersized and unable to accommodate the additional volume from the construction of a new water treatment plant. The lagoon expansion will require tree clearing, and soil stripping and excavation (~7,500 square meters of clearing). Maintenance vegetation removal and additional modifications to the existing ...

Last UpdatedDisplay Filters

Filters

Authorities Display Filters

Comment Tags Display Filters

Date modified: